{"id":129765,"date":"2020-05-29T16:00:12","date_gmt":"2020-05-29T14:00:12","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/noticias-locales\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/"},"modified":"2025-03-10T18:51:58","modified_gmt":"2025-03-10T17:51:58","slug":"webber-awarded-301m-sl-12-reconstruction-in-dallas-tx","status":"publish","type":"local_new","link":"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/","title":{"rendered":"Webber Awarded $301M SL-12 Reconstruction in Dallas, TX"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>Webber, LLC was awarded the reconstruction of 7.4 miles of SL 12 in Dallas for $301 million by the Texas Department of Transportation. The project was bid in an A + B proposal, considering project cost and schedule. This proposal method helps reduce the time that the traffic will be affected by construction while also considering low bid price.<\/p>\n<p>The contract includes reconstruction of existing Interchanges between State Loop 12, State Spur 482, State Highway 114 and 183. The project scope of work involves construction of 32 new bridges, walls and concrete pavement, widening of existing main lanes and frontage roads. Additional work includes grading, subgrade stabilization, drainage, water, sanitary sewer, flatwork, signals, illumination, ITS, signing, pavement markings, landscape and irrigation.<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                \u201cWebber is excited to win this project; a project which will allow commuters an easier time navigating this area with improved connectivity and the ability to avoid the traffic congestion normally seen here during peak traffic times.\u201d            <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\">Josh Goyne<\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                        President of Webber\u2019s Heavy Civil Division                    <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>The general project limits run SH 183 from Carl Road to Levee East of the SH 183 Split; Loop 12 from 1,900 feet South of Shady Grove to Texas Plaza Drive; SH 114 from Loop 12 Bridge to SH 183; and Spur 482 from SH 114 to the Western Levee. The project is scheduled to last about 48 months, beginning in Fall 2020 with substantial completion expected in Fall 2024.<\/p>\n<h2><strong>About Webber, LLC<\/strong><\/h2>\n<p>Founded in 1963, Webber is a leading heavy civil and waterworks construction company and material producer dedicated to safely providing intelligent solutions to its clients and community. As a wholly owned subsidiary of Ferrovial S.A., an international company based in\u00a0Madrid, Spain, Webber has access to a global network of skilled engineers, best-in-class technology and vast resources. Webber is headquartered in\u00a0Houston, Texas, with regional offices in South, North and Central Texas, as well as Fairfax, Virginia and Atlanta, Georgia. Webber was selected by Engineering News-Record as 2018 Contractor of the Year for the\u00a0Texas\/Louisiana\u00a0region and has been named a National AGC safety award winner for the past six consecutive years.<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":129767,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[2933,3047,3039],"nivel-5":[3028],"nivel-1":[2870,3134],"nivel-3":[2802],"nivel-4":[3055,2823],"class_list":["post-129765","local_new","type-local_new","status-publish","has-post-thumbnail","hentry","nivel-2-awarded-contracts-en-us","nivel-2-heavy-civil-en-us","nivel-2-public-works-en-us","nivel-5-webber-en-us","nivel-1-construction-en-us","nivel-1-highways-en-us","nivel-3-united-states-en-us","nivel-4-dallas-en-us","nivel-4-texas-en-us"],"acf":[],"yoast_head":"<title>Webber Awarded $301M SL-12 Reconstruction in Dallas, TX - Ferrovial<\/title>\n<meta name=\"description\" content=\"Webber awarded the reconstruction of 7.4 miles of SL 12 in Dallas for $301 million by the Texas Department of Transportation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Webber Awarded $301M SL-12 Reconstruction in Dallas, TX - Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Webber awarded the reconstruction of 7.4 miles of SL 12 in Dallas for $301 million by the Texas Department of Transportation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-10T17:51:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2020\/05\/13162430\/sl-12-map-image.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"598\" \/>\n\t<meta property=\"og:image:height\" content=\"411\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/\",\"name\":\"Webber Awarded $301M SL-12 Reconstruction in Dallas, TX - Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en-us\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/05\/15133850\/sl-12-map-image.jpg\",\"datePublished\":\"2020-05-29T14:00:12+00:00\",\"dateModified\":\"2025-03-10T17:51:58+00:00\",\"description\":\"Webber awarded the reconstruction of 7.4 miles of SL 12 in Dallas for $301 million by the Texas Department of Transportation.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/05\/15133850\/sl-12-map-image.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/05\/15133850\/sl-12-map-image.jpg\",\"width\":598,\"height\":411},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en-us\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Webber Awarded $301M SL-12 Reconstruction in Dallas, TX\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en-us\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en-us\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en-us\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en-us\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en-us\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en-us\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en-us\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en-us\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Webber Awarded $301M SL-12 Reconstruction in Dallas, TX - Ferrovial","description":"Webber awarded the reconstruction of 7.4 miles of SL 12 in Dallas for $301 million by the Texas Department of Transportation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/","og_locale":"en_US","og_type":"article","og_title":"Webber Awarded $301M SL-12 Reconstruction in Dallas, TX - Ferrovial","og_description":"Webber awarded the reconstruction of 7.4 miles of SL 12 in Dallas for $301 million by the Texas Department of Transportation.","og_url":"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2025-03-10T17:51:58+00:00","og_image":[{"width":598,"height":411,"url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2020\/05\/13162430\/sl-12-map-image.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/","url":"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/","name":"Webber Awarded $301M SL-12 Reconstruction in Dallas, TX - Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en-us\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/05\/15133850\/sl-12-map-image.jpg","datePublished":"2020-05-29T14:00:12+00:00","dateModified":"2025-03-10T17:51:58+00:00","description":"Webber awarded the reconstruction of 7.4 miles of SL 12 in Dallas for $301 million by the Texas Department of Transportation.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/05\/15133850\/sl-12-map-image.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/05\/15133850\/sl-12-map-image.jpg","width":598,"height":411},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en-us\/local-news\/webber-awarded-301m-sl-12-reconstruction-in-dallas-tx\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en-us\/"},{"@type":"ListItem","position":2,"name":"Webber Awarded $301M SL-12 Reconstruction in Dallas, TX"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en-us\/#website","url":"https:\/\/newsroom.ferrovial.com\/en-us\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en-us\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en-us\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en-us\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en-us\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/newsroom.ferrovial.com\/en-us\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en-us\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en-us\/wp-json\/wp\/v2\/local_new\/129765","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en-us\/wp-json\/wp\/v2\/local_new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en-us\/wp-json\/wp\/v2\/types\/local_new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en-us\/wp-json\/wp\/v2\/comments?post=129765"}],"version-history":[{"count":1,"href":"https:\/\/newsroom.ferrovial.com\/en-us\/wp-json\/wp\/v2\/local_new\/129765\/revisions"}],"predecessor-version":[{"id":131547,"href":"https:\/\/newsroom.ferrovial.com\/en-us\/wp-json\/wp\/v2\/local_new\/129765\/revisions\/131547"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en-us\/wp-json\/wp\/v2\/media\/129767"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en-us\/wp-json\/wp\/v2\/media?parent=129765"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en-us\/wp-json\/wp\/v2\/nivel-2?post=129765"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en-us\/wp-json\/wp\/v2\/nivel-5?post=129765"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en-us\/wp-json\/wp\/v2\/nivel-1?post=129765"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en-us\/wp-json\/wp\/v2\/nivel-3?post=129765"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en-us\/wp-json\/wp\/v2\/nivel-4?post=129765"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}