{"id":102975,"date":"2021-07-13T13:18:29","date_gmt":"2021-07-13T11:18:29","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=local_new&#038;p=102975"},"modified":"2022-12-20T18:10:52","modified_gmt":"2022-12-20T17:10:52","slug":"ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay","status":"publish","type":"local_new","link":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/","title":{"rendered":"Ferrovial completes the improvement of the Toloto stream in Biscay"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>The Toloto stream, which was piped years ago under the town on its way through Elorrio (Vizcaya), has been recovered after restoring the 300 meters before it flows into the Ibaizabal river.<\/p>\n<p>The project consisted in the creation of a new open-air river bed with a hydraulic capacity sufficient for a flow of 21 m<sup>3<\/sup>\/s. Two bridges had to be built and all the affected services and riverbank vegetation had to be replaced.<\/p>\n<p>It was a priority to respect the presence of native species, such as the European\u00a0<em>mink (Mustela lutreola)<\/em>. The works took place in an urban context and adjacent to a kindergarten, so it was necessary to adapt the execution of demolition and execution works to the needs of the neighbors and children.<\/p>\n<p>According to Xabier Aguiar, Works Manager, &#8220;the execution of a new riverbed in an urban area such as Elorrio has forced us to combine technical and environmental actions, leading us to contribute new ideas to the project, improving the final result of the project&#8221;.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-max wp-image-102971\" src=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2021\/07\/20201209-151541-1920x1440.jpg\" alt=\"Arroyo Toloto\" width=\"1920\" height=\"1440\" srcset=\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142758\/20201209-151541-1920x1440.jpg 1920w, https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142758\/20201209-151541-300x225.jpg 300w, https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142758\/20201209-151541-1024x768.jpg 1024w, https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142758\/20201209-151541-768x576.jpg 768w, https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142758\/20201209-151541-1536x1152.jpg 1536w, https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142758\/20201209-151541-2048x1536.jpg 2048w, https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142758\/20201209-151541-800x600.jpg 800w, https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142758\/20201209-151541-880x660.jpg 880w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<h2><b><strong>A new environment<\/strong><\/b><\/h2>\n<p>To recreate a new environment of faunistic interest and ecological connectivity, it was necessary to\u00a0<b><strong>combine different engineering techniques in the riverbed to support the expected erosions.<\/strong><\/b>\u00a0Also, concrete structures were demolished at the junction of the new riverbed with the Ibaizabal River. An exhaustive environmental integration of the entire area was achieved through the use of live fences, staking, tree or shrub planting, hydroseeding, etc.<\/p>\n<p>Another of the measures implemented\u00a0<b><strong>by Ferrovial Construction was to place nesting boxes for bats to encourage the presence of these insectivores<\/strong><\/b>\u00a0in a riverside area upstream of the construction site. This proposal was completed with an informative talk for children about the benefits of bats as natural &#8216;insecticides&#8217; and their contribution to the faunal and ecological diversity of the area, showing the nest boxes in situ and explaining how they work.<\/p>\n<p>According to \u00c1lvaro Pozueta, Quality and Environment Advisor, &#8220;the Toloto stream adaptation project has been a work with interesting environmental implications, which thanks to the environmental awareness of Xabier Aguiar, Arturo Ogara, Koldo Zuloaga, Javier Pato, Eduardo Fonseca y Fernando Beltranilla has been solved in an impeccable way, obtaining the satisfaction of both the client (URA) and the City Council of Elorrio. I can only congratulate the whole team!&#8221;<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":102968,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1949,1098,1072],"nivel-5":[2148],"nivel-1":[896],"nivel-3":[1321],"nivel-4":[],"class_list":["post-102975","local_new","type-local_new","status-publish","has-post-thumbnail","hentry","nivel-2-conservation-and-restoration","nivel-2-environmental-conservation","nivel-2-water","nivel-5-ferrovial-construction","nivel-1-construction","nivel-3-spain"],"acf":[],"yoast_head":"<title>Ferrovial completes the improvement of the Toloto stream in Biscay - Ferrovial<\/title>\n<meta name=\"description\" content=\"The execution of the project to improve the urban section of the Toloto stream has been completed by Ferrovial Construction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ferrovial completes the improvement of the Toloto stream in Biscay - Ferrovial\" \/>\n<meta property=\"og:description\" content=\"The execution of the project to improve the urban section of the Toloto stream has been completed by Ferrovial Construction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-20T17:10:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2021\/07\/20201214-144059-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/\",\"name\":\"Ferrovial completes the improvement of the Toloto stream in Biscay - Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142759\/20201214-144059-scaled.jpg\",\"datePublished\":\"2021-07-13T11:18:29+00:00\",\"dateModified\":\"2022-12-20T17:10:52+00:00\",\"description\":\"The execution of the project to improve the urban section of the Toloto stream has been completed by Ferrovial Construction.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142759\/20201214-144059-scaled.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142759\/20201214-144059-scaled.jpg\",\"width\":2560,\"height\":1920,\"caption\":\"Adecuaci\u00f3n arroyo Toloto Bizkaia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ferrovial completes the improvement of the Toloto stream in Biscay\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Ferrovial completes the improvement of the Toloto stream in Biscay - Ferrovial","description":"The execution of the project to improve the urban section of the Toloto stream has been completed by Ferrovial Construction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/","og_locale":"en_US","og_type":"article","og_title":"Ferrovial completes the improvement of the Toloto stream in Biscay - Ferrovial","og_description":"The execution of the project to improve the urban section of the Toloto stream has been completed by Ferrovial Construction.","og_url":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-20T17:10:52+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2021\/07\/20201214-144059-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/","url":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/","name":"Ferrovial completes the improvement of the Toloto stream in Biscay - Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142759\/20201214-144059-scaled.jpg","datePublished":"2021-07-13T11:18:29+00:00","dateModified":"2022-12-20T17:10:52+00:00","description":"The execution of the project to improve the urban section of the Toloto stream has been completed by Ferrovial Construction.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142759\/20201214-144059-scaled.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142759\/20201214-144059-scaled.jpg","width":2560,"height":1920,"caption":"Adecuaci\u00f3n arroyo Toloto Bizkaia"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/ferrovial-completes-the-improvement-of-the-toloto-stream-in-biscay\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Ferrovial completes the improvement of the Toloto stream in Biscay"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/102975","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/local_new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=102975"}],"version-history":[{"count":2,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/102975\/revisions"}],"predecessor-version":[{"id":102977,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/102975\/revisions\/102977"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/102968"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=102975"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=102975"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=102975"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=102975"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=102975"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=102975"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}