{"id":106384,"date":"2022-04-20T20:04:14","date_gmt":"2022-04-20T18:04:14","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=local_new&#038;p=106384"},"modified":"2022-12-20T18:09:49","modified_gmt":"2022-12-20T17:09:49","slug":"plw-waterworks-awarded-279m-in-texas-projects","status":"publish","type":"local_new","link":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/","title":{"rendered":"PLW Waterworks awarded $279M in Texas projects"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p><strong>PLW Waterworks, a division of <\/strong><a href=\"https:\/\/www.ferrovial.com\/en-us\/webber\/\"><strong>Webber<\/strong><\/a>, has been awarded three waterworks contracts in Texas. The combined value of contracts is $279 million.<\/p>\n<p>The city of <strong>Georgetown<\/strong> has selected PLW Waterworks to construct a new 44 MGD Water Treatment Plant to provide drinking water for one of the fastest growing population areas in Texas. The contract value is $175.2 million and is the largest project in Georgetown\u2019s history and the largest project win in PLW\u2019s history.<\/p>\n<p>The scope of work includes construction and startup of all the treatment structures for the new plant, a new raw water intake and pump station on South Lake and a 42-inch waterline connecting the lake and the plant.<\/p>\n<p>The project is expected to be completed in early 2026.<\/p>\n<p>The city of San Angelo has also awarded PLW the improvement works of the <strong>City\u2019s Hickory Groundwater Treatment Plant<\/strong> to increase production capacity from 8 MGD to 12 MGD for a total value of $52.8 million.<\/p>\n<p>The project consists of construction and startup of a triplex low-head pump station, two new 2MG precast concrete clear wells and the expansion of the oxidation contractor system, the iron removal filtration system and the radium reduction system.<\/p>\n<p>The project is expected to be completed in early 2024.<\/p>\n<p>Finally, PLW will construct a new Wastewater Treatment Plant in Laredo for $51.1 million. The new <strong>Manadas Creek Wastewater Treatment Plant<\/strong> will have a wastewater treatment capacity of 4.75 MGD. The project team will also install the gravity pipe outfall to lead the clean water to Manadas Creek Tributary 2.<\/p>\n<p>The project is expected to be completed in early 2025.<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                \u201cWe are honored by the trust and responsibility that these three great cities, from different geographies in Texas, have placed on us to build these water facilities. These water plants will largely contribute to the economic and social development and well-being of their communities.\u201d            <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\">Emilio Lopez<\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                        PLW Waterworks President                     <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":106385,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1072,1185],"nivel-5":[2028,1712],"nivel-1":[896],"nivel-3":[1322],"nivel-4":[1822],"class_list":["post-106384","local_new","type-local_new","status-publish","has-post-thumbnail","hentry","nivel-2-water","nivel-2-water-treatment-plant","nivel-5-plw-en","nivel-5-webber-en","nivel-1-construction","nivel-3-united-states","nivel-4-texas-en"],"acf":[],"yoast_head":"<title>PLW Waterworks awarded $279M in Texas projects - Ferrovial<\/title>\n<meta name=\"description\" content=\"Georgetown, San Angelo and Laredo have selected PLW Waterworks, a division of Webber, to execute water treatment projects.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PLW Waterworks awarded $279M in Texas projects - Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Georgetown, San Angelo and Laredo have selected PLW Waterworks, a division of Webber, to execute water treatment projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-20T17:09:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2022\/04\/rowlett-creek-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/\",\"name\":\"PLW Waterworks awarded $279M in Texas projects - Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15133614\/rowlett-creek-scaled.jpg\",\"datePublished\":\"2022-04-20T18:04:14+00:00\",\"dateModified\":\"2022-12-20T17:09:49+00:00\",\"description\":\"Georgetown, San Angelo and Laredo have selected PLW Waterworks, a division of Webber, to execute water treatment projects.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15133614\/rowlett-creek-scaled.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15133614\/rowlett-creek-scaled.jpg\",\"width\":2560,\"height\":1440,\"caption\":\"Water Treatment Plant\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PLW Waterworks awarded $279M in Texas projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"PLW Waterworks awarded $279M in Texas projects - Ferrovial","description":"Georgetown, San Angelo and Laredo have selected PLW Waterworks, a division of Webber, to execute water treatment projects.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/","og_locale":"en_US","og_type":"article","og_title":"PLW Waterworks awarded $279M in Texas projects - Ferrovial","og_description":"Georgetown, San Angelo and Laredo have selected PLW Waterworks, a division of Webber, to execute water treatment projects.","og_url":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-20T17:09:49+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2022\/04\/rowlett-creek-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/","url":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/","name":"PLW Waterworks awarded $279M in Texas projects - Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15133614\/rowlett-creek-scaled.jpg","datePublished":"2022-04-20T18:04:14+00:00","dateModified":"2022-12-20T17:09:49+00:00","description":"Georgetown, San Angelo and Laredo have selected PLW Waterworks, a division of Webber, to execute water treatment projects.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15133614\/rowlett-creek-scaled.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15133614\/rowlett-creek-scaled.jpg","width":2560,"height":1440,"caption":"Water Treatment Plant"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/plw-waterworks-awarded-279m-in-texas-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"PLW Waterworks awarded $279M in Texas projects"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/106384","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/local_new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=106384"}],"version-history":[{"count":3,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/106384\/revisions"}],"predecessor-version":[{"id":106392,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/106384\/revisions\/106392"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/106385"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=106384"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=106384"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=106384"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=106384"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=106384"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=106384"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}