{"id":106648,"date":"2022-05-18T17:07:44","date_gmt":"2022-05-18T15:07:44","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=local_new&#038;p=106648"},"modified":"2022-12-20T18:09:17","modified_gmt":"2022-12-20T17:09:17","slug":"signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta","status":"publish","type":"local_new","link":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/","title":{"rendered":"Signed contract for the construction of the Active Carbon Powder Dosing Facility at the WWTP in Venta Alta"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>The Bilbao Bizkaia Water Consortium, with the Joint Venture consisting of <a href=\"https:\/\/www.ferrovial.com\/en\/f-construction\/\" target=\"_blank\" rel=\"dofollow noopener\">Ferrovial Construction<\/a> and <a href=\"https:\/\/www.ferrovial.com\/en\/cadagua\/\" target=\"_blank\" rel=\"dofollow noopener\">Cadagua<\/a>, has signed the contract to construct the Active Carbon Powder Dosing Facility at the WWTP in Venta Alta.<\/p>\n<p>With the execution of this contract, the WWTP will be equipped to treat the plant&#8217;s incoming flow in situations where the characteristics of the water treated are of worse quality than the current ones, whether from the Zadorra or the Nerbioi.<\/p>\n<p>This facility will complement the active carbon filtration currently being refurbished by Ferrovial Construction and Cadagua in a joint venture in the second phase of Alta Sale.<\/p>\n<p>The Venta Alta WWTP is the main water treatment plant in Biscay. It treats the water arriving from the reservoirs of the Zadorra system, which stores 90% of the water that the Consortium supplies to the municipalities belonging to it (with one million inhabitants).<\/p>\n<p>The treatment capacity of these facilities is 7 m3\/s.<\/p>\n<ul>\n<li>The first phase of 3 m3\/s maximum capacity went into service in 1968, and it was the focus of comprehensive refurbishment by Cadagua in 2015.<\/li>\n<li>The second phase, with a maximum capacity of 4 m3\/s, was designed and built in 1980.<\/li>\n<li>In 2007, the new treated water tanks carried out by Ferrovial Agroman went into service; they have capacities of 60,000 m3 and 80,000 m3, respectively.<\/li>\n<\/ul>\n<p>Cadagua has designed and built more than 235 water treatment plants (drinking, waste, and desalination), reaching a total treatment capacity of more than 15,000,000 m\u00b3\/d. According to the Maintenance and Use service, the number of equivalent inhabitants served exceeds 21,000,000. These figures put Cadagua in the lead of Spanish companies in this sector.<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":106649,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1072,1169],"nivel-5":[2157],"nivel-1":[896],"nivel-3":[],"nivel-4":[1820],"class_list":["post-106648","local_new","type-local_new","status-publish","has-post-thumbnail","hentry","nivel-2-water","nivel-2-works","nivel-5-cadagua-en","nivel-1-construction","nivel-4-basque-country"],"acf":[],"yoast_head":"<title>Signed contract for the construction of the Active Carbon Powder Dosing Facility at the WWTP in Venta Alta - Ferrovial<\/title>\n<meta name=\"description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Signed contract for the construction of the Active Carbon Powder Dosing Facility at the WWTP in Venta Alta - Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-20T17:09:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2022\/05\/planta-de-tratamiento-de-de-agua-bilabo-cadagua-1-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/\",\"name\":\"Signed contract for the construction of the Active Carbon Powder Dosing Facility at the WWTP in Venta Alta - Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/05\/15141948\/planta-de-tratamiento-de-de-agua-bilabo-cadagua-1-scaled.jpg\",\"datePublished\":\"2022-05-18T15:07:44+00:00\",\"dateModified\":\"2022-12-20T17:09:17+00:00\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/05\/15141948\/planta-de-tratamiento-de-de-agua-bilabo-cadagua-1-scaled.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/05\/15141948\/planta-de-tratamiento-de-de-agua-bilabo-cadagua-1-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Planta de tratamiento de de agua Bilbao - Cadagua\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Signed contract for the construction of the Active Carbon Powder Dosing Facility at the WWTP in Venta Alta\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Signed contract for the construction of the Active Carbon Powder Dosing Facility at the WWTP in Venta Alta - Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/","og_locale":"en_US","og_type":"article","og_title":"Signed contract for the construction of the Active Carbon Powder Dosing Facility at the WWTP in Venta Alta - Ferrovial","og_description":"Sala de prensa Ferrovial | \u00daltimas noticias","og_url":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-20T17:09:17+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2022\/05\/planta-de-tratamiento-de-de-agua-bilabo-cadagua-1-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/","url":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/","name":"Signed contract for the construction of the Active Carbon Powder Dosing Facility at the WWTP in Venta Alta - Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/05\/15141948\/planta-de-tratamiento-de-de-agua-bilabo-cadagua-1-scaled.jpg","datePublished":"2022-05-18T15:07:44+00:00","dateModified":"2022-12-20T17:09:17+00:00","description":"Sala de prensa Ferrovial | \u00daltimas noticias","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/05\/15141948\/planta-de-tratamiento-de-de-agua-bilabo-cadagua-1-scaled.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/05\/15141948\/planta-de-tratamiento-de-de-agua-bilabo-cadagua-1-scaled.jpg","width":2560,"height":1707,"caption":"Planta de tratamiento de de agua Bilbao - Cadagua"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/signed-contract-for-the-construction-of-the-active-carbon-powder-dosing-facility-at-the-wwtp-in-venta-alta\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Signed contract for the construction of the Active Carbon Powder Dosing Facility at the WWTP in Venta Alta"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/106648","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/local_new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=106648"}],"version-history":[{"count":3,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/106648\/revisions"}],"predecessor-version":[{"id":111022,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/106648\/revisions\/111022"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/106649"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=106648"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=106648"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=106648"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=106648"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=106648"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=106648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}