{"id":92054,"date":"2018-03-18T18:08:12","date_gmt":"2018-03-18T17:08:12","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=local_new&#038;p=89858"},"modified":"2022-12-20T18:23:00","modified_gmt":"2022-12-20T17:23:00","slug":"construction-of-new-bridge-over-the-clarence-at-harwood-continues","status":"publish","type":"local_new","link":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\/","title":{"rendered":"Construction of new bridge over the Clarence at Harwood continues"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>Mr McCormack said once open the new bridge would improve safety and efficiency on the Pacific Highway by removing the need to stop traffic while the current truss bridge&#8217;s lift span is raised to give high vessels safe passage on the river.<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                &quot;This 1.5-kilometre crossing is one of the crown jewels of the Woolgoolga to Ballina section of the Pacific Highway upgrade and the ongoing installation of concrete girders, each up to 44 metres long, is an impressive project,&quot;            <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\">Michael McCormack <\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                        Deputy Prime Minister and Minister for Infrastructure and Transport                     <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>New South Wales Minister for Roads, Maritime and Freight Melinda Pavey said the 144 girders would continue to be installed over the next six months<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                &quot;The milestones keep coming for this transformational project, with girder installation ongoing following the completion of all 117 land and marine piles late last year,&quot;             <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\">Melinda Pavey<\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                        New South Wales Minister for Roads, Maritime and Freight                    <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>Federal Member for Page Kevin Hogan said the bridge would be the largest to be built as part of the 155-kilometre Woolgoolga to Ballina sec<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                The existing Harwood Bridge will become part of the local road network when the new bridge opens, providing an alternative route for residents and businesses,            <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\">Kevin Hogan<\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                        Federal Member for Page                    <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>New South Wales Member for Clarence Chris Gulaptis said each girder weighed about 168 tonnes.<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                The installation of the u-girders will steadily get more challenging, with the highest girder on the bridge reaching about 30 metres above the river,            <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\">Chris Gulaptis<\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                        New South Wales Member for Clarence                    <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>The new bridge across the Clarence River at Harwood will open to traffic in 2020. The Australian and New South Wales governments are jointly funding the Woolgoolga to Ballina project on an 80:20 basis.<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":92468,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1188],"nivel-5":[2148],"nivel-1":[896],"nivel-3":[1317],"nivel-4":[],"class_list":["post-92054","local_new","type-local_new","status-publish","has-post-thumbnail","hentry","nivel-2-bridges","nivel-5-ferrovial-construction","nivel-1-construction","nivel-3-australia-en"],"acf":[],"yoast_head":"<title>Construction of new bridge over the Clarence at Harwood continues<\/title>\n<meta name=\"description\" content=\"Construction of new bridge over the Clarence at Harwood continues\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of new bridge over the Clarence at Harwood continues\" \/>\n<meta property=\"og:description\" content=\"Construction of new bridge over the Clarence at Harwood continues\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-20T17:23:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2019\/12\/construction-of-new-bridge-over-the-clarence-at-harwood-continues.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"500\" \/>\n\t<meta property=\"og:image:height\" content=\"368\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/local-news\\\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\\\/\",\"url\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/local-news\\\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\\\/\",\"name\":\"Construction of new bridge over the Clarence at Harwood continues\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/local-news\\\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/local-news\\\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2019\\\/12\\\/15144246\\\/construction-of-new-bridge-over-the-clarence-at-harwood-continues.jpg\",\"datePublished\":\"2018-03-18T17:08:12+00:00\",\"dateModified\":\"2022-12-20T17:23:00+00:00\",\"description\":\"Construction of new bridge over the Clarence at Harwood continues\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/local-news\\\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\\\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/local-news\\\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/local-news\\\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2019\\\/12\\\/15144246\\\/construction-of-new-bridge-over-the-clarence-at-harwood-continues.jpg\",\"contentUrl\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2019\\\/12\\\/15144246\\\/construction-of-new-bridge-over-the-clarence-at-harwood-continues.jpg\",\"width\":500,\"height\":368},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/local-news\\\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of new bridge over the Clarence at Harwood continues\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2018\\\/07\\\/15145720\\\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2018\\\/07\\\/15145720\\\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ferrovial\",\"https:\\\/\\\/x.com\\\/ferrovial\",\"https:\\\/\\\/www.instagram.com\\\/ferrovial\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/ferrovial\",\"https:\\\/\\\/www.pinterest.es\\\/ferrovial\\\/\",\"https:\\\/\\\/www.youtube.com\\\/ferrovial\",\"https:\\\/\\\/en.wikipedia.org\\\/wiki\\\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Construction of new bridge over the Clarence at Harwood continues","description":"Construction of new bridge over the Clarence at Harwood continues","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\/","og_locale":"en_US","og_type":"article","og_title":"Construction of new bridge over the Clarence at Harwood continues","og_description":"Construction of new bridge over the Clarence at Harwood continues","og_url":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-20T17:23:00+00:00","og_image":[{"width":500,"height":368,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2019\/12\/construction-of-new-bridge-over-the-clarence-at-harwood-continues.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\/","url":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\/","name":"Construction of new bridge over the Clarence at Harwood continues","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/12\/15144246\/construction-of-new-bridge-over-the-clarence-at-harwood-continues.jpg","datePublished":"2018-03-18T17:08:12+00:00","dateModified":"2022-12-20T17:23:00+00:00","description":"Construction of new bridge over the Clarence at Harwood continues","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/local-news\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/12\/15144246\/construction-of-new-bridge-over-the-clarence-at-harwood-continues.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/12\/15144246\/construction-of-new-bridge-over-the-clarence-at-harwood-continues.jpg","width":500,"height":368},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/construction-of-new-bridge-over-the-clarence-at-harwood-continues\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Construction of new bridge over the Clarence at Harwood continues"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/92054","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/local_new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=92054"}],"version-history":[{"count":1,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/92054\/revisions"}],"predecessor-version":[{"id":110816,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/92054\/revisions\/110816"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/92468"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=92054"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=92054"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=92054"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=92054"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=92054"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=92054"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}