{"id":98664,"date":"2020-07-31T12:27:19","date_gmt":"2020-07-31T10:27:19","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=local_new&#038;p=98664"},"modified":"2022-12-20T18:15:52","modified_gmt":"2022-12-20T17:15:52","slug":"four-treatment-plants-finished-in-caceres","status":"publish","type":"local_new","link":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/","title":{"rendered":"Four Treatment Plants in the Herv\u00e1s Agrarian Region Now Finished in C\u00e1ceres"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p><span data-contrast=\"auto\">Given the need to comply with European regulations on water purification, a series of Wastewater Treatment Plants (WWTPs) have been built. These are part of the Hydrographic Confederation of the Tagus, and the plants in the\u00a0Herv\u00e1s\u00a0Agrarian Region stand out in this group. Many of the municipalities in this region<\/span><span data-contrast=\"auto\">\u00a0<\/span><span data-contrast=\"auto\">located in the north of C\u00e1ceres did not have the facilities needed to\u00a0<\/span><span data-contrast=\"auto\">ensure\u00a0<\/span><span data-contrast=\"auto\">purif<\/span><span data-contrast=\"auto\">ication<\/span><span data-contrast=\"auto\">\u00a0<\/span><span data-contrast=\"auto\">at<\/span><span data-contrast=\"auto\">\u00a0the levels needed.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The WWTPs built by the joint venture between Ferrovial Construction and\u00a0Cadagua\u00a0stand out among those recently built for this package in the area. These\u00a0are located in\u00a0Ahigal, La Granja, Mohedas de Granadilla, and Zarza de Granadilla.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:257}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Construction included four independent treatment plants with prolonged aeration technology.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:257}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Each of the four treatment plants connects with the munic<\/span><span data-contrast=\"auto\">i<\/span><span data-contrast=\"auto\">palities&#8217; existing sewer system, where a spillway has been added to ensure the separation of flows. This enables treating ten times the average summer flow of each one, redirecting the rest (stormwater) to irrigation.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:257}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">A total of\u00a0<\/span><span data-contrast=\"auto\">1,200 m of PVC pipes\u00a0<\/span><span data-contrast=\"auto\">400 mm\u00a0<\/span><span data-contrast=\"auto\">in diameter\u00a0<\/span><span data-contrast=\"auto\">have been\u00a0<\/span><span data-contrast=\"auto\">laid\u00a0<\/span><span data-contrast=\"auto\">to direct sewage to the proper WWTP. They&#8217;re set at slopes ranging from 0.3% to 3%.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:257}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The electricity supply is at medium voltage. A total of 2,600 m is derived from powerlines, and each WWTP has a 160 kVA transformer.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:257}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The most important characteristics of each one\u00a0are\u00a0listed below.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:257}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Ahigal:<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:257}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">Population equivalent: 3,115\u00a0inhabitant<\/span><\/li>\n<li><span data-contrast=\"auto\">Average flow: 29.85 m3\/h<\/span><\/li>\n<li><span data-contrast=\"auto\">Pretreatment with compact equipment<\/span><\/li>\n<li><span data-contrast=\"auto\">Carousel biological reactor with a removable diffuser grid<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:257}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><b><span data-contrast=\"auto\">La Granja:<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:257}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">Population equivalent: 672 inhabitants<\/span><\/li>\n<li><span data-contrast=\"auto\">Average flow: 6.44 m3\/h<\/span><\/li>\n<li><span data-contrast=\"auto\">Pretreatment with compact equipment<\/span><\/li>\n<li><span data-contrast=\"auto\">Carousel biological reactor with aerators<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:257}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><b><span data-contrast=\"auto\">Mohedas de Granadilla:<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:257}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">Population equivalent: 2,070 inhabitants<\/span><\/li>\n<li><span data-contrast=\"auto\">Average flow: 19.84 m3\/h<\/span><\/li>\n<li><span data-contrast=\"auto\">Pretreatment with compact equipment<\/span><\/li>\n<li><span data-contrast=\"auto\">Carousel biological reactor with aerators<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:257}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><b><span data-contrast=\"auto\">\u00a0Zarza de Granadilla:<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:257}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">Population equivalent: 3,344 inhabitants<\/span><\/li>\n<li><span data-contrast=\"auto\">Average flow: 32.04 m3\/h<\/span><\/li>\n<li><span data-contrast=\"auto\">Pretreatment with compact equipment<\/span><\/li>\n<li><span data-contrast=\"auto\">Carousel biological reactor with a removable diffuser grid<\/span><\/li>\n<\/ul>\n<p><iframe loading=\"lazy\" title=\"Finalizadas las cuatro Depuradoras de la Comarca Agraria de Herv\u00e1s, en C\u00e1ceres\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/II_4gAsGeo8?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":98661,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1073,1897,1072,1977,1185],"nivel-5":[2157],"nivel-1":[896],"nivel-3":[1321],"nivel-4":[],"class_list":["post-98664","local_new","type-local_new","status-publish","has-post-thumbnail","hentry","nivel-2-waste-water","nivel-2-edar-en","nivel-2-water","nivel-2-water-infrastructure","nivel-2-water-treatment-plant","nivel-5-cadagua-en","nivel-1-construction","nivel-3-spain"],"acf":[],"yoast_head":"<title>Four Treatment Plants in the Herv\u00e1s Agrarian Region Now Finished in C\u00e1ceres - Ferrovial<\/title>\n<meta name=\"description\" content=\"Construction included four independent treatment plants with prolonged aeration technology.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Four Treatment Plants in the Herv\u00e1s Agrarian Region Now Finished in C\u00e1ceres - Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Construction included four independent treatment plants with prolonged aeration technology.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-20T17:15:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2020\/07\/proyecto-edars_ferronet-julio-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"837\" \/>\n\t<meta property=\"og:image:height\" content=\"505\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/\",\"name\":\"Four Treatment Plants in the Herv\u00e1s Agrarian Region Now Finished in C\u00e1ceres - Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/07\/15143422\/proyecto-edars_ferronet-julio-1.png\",\"datePublished\":\"2020-07-31T10:27:19+00:00\",\"dateModified\":\"2022-12-20T17:15:52+00:00\",\"description\":\"Construction included four independent treatment plants with prolonged aeration technology.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/07\/15143422\/proyecto-edars_ferronet-julio-1.png\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/07\/15143422\/proyecto-edars_ferronet-julio-1.png\",\"width\":837,\"height\":505,\"caption\":\"cadagua project water treatment plants construction caceres\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Four Treatment Plants in the Herv\u00e1s Agrarian Region Now Finished in C\u00e1ceres\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Four Treatment Plants in the Herv\u00e1s Agrarian Region Now Finished in C\u00e1ceres - Ferrovial","description":"Construction included four independent treatment plants with prolonged aeration technology.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/","og_locale":"en_US","og_type":"article","og_title":"Four Treatment Plants in the Herv\u00e1s Agrarian Region Now Finished in C\u00e1ceres - Ferrovial","og_description":"Construction included four independent treatment plants with prolonged aeration technology.","og_url":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-20T17:15:52+00:00","og_image":[{"width":837,"height":505,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2020\/07\/proyecto-edars_ferronet-julio-1.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/","url":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/","name":"Four Treatment Plants in the Herv\u00e1s Agrarian Region Now Finished in C\u00e1ceres - Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/07\/15143422\/proyecto-edars_ferronet-julio-1.png","datePublished":"2020-07-31T10:27:19+00:00","dateModified":"2022-12-20T17:15:52+00:00","description":"Construction included four independent treatment plants with prolonged aeration technology.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/07\/15143422\/proyecto-edars_ferronet-julio-1.png","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/07\/15143422\/proyecto-edars_ferronet-julio-1.png","width":837,"height":505,"caption":"cadagua project water treatment plants construction caceres"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/local-news\/four-treatment-plants-finished-in-caceres\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Four Treatment Plants in the Herv\u00e1s Agrarian Region Now Finished in C\u00e1ceres"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/98664","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/local_new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=98664"}],"version-history":[{"count":1,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/98664\/revisions"}],"predecessor-version":[{"id":98665,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/local_new\/98664\/revisions\/98665"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/98661"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=98664"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=98664"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=98664"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=98664"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=98664"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=98664"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}