{"id":100712,"date":"2020-12-10T13:33:35","date_gmt":"2020-12-10T12:33:35","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=new&#038;p=100712"},"modified":"2022-12-21T08:45:10","modified_gmt":"2022-12-21T07:45:10","slug":"california-rail-builders-completes-viaduct-structure-in-record-time","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/","title":{"rendered":"California Rail Builders Completes Viaduct Structure in Record Time"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>The <a href=\"https:\/\/www.californiarailbuilders.com\/who-we-are\/\" target=\"_blank\" rel=\"noopener\"><strong>California Rail Builders (CRB)<\/strong><\/a> team reached a major milestone on its work on the <a href=\"https:\/\/newsroom.ferrovial.com\/en\/press_releases\/ferrovial-chosen-to-build-section-of-new-high-speed-railway-california-for-347-million-dollars\/\" target=\"_blank\" rel=\"noopener\"><strong>California High-Speed Rail<\/strong> project<\/a> with the completion of the<strong> Poso Creek Viaduct<\/strong> last week. What is most significant about this structure \u2013 one of seven within the project scope \u2013 is that its complex, post-tensioned superstructure was completed in just <strong>three months\u2019 time<\/strong>.<\/p>\n<p>The project team was up against a firm October 15 deadline and had to adhere to strict working hours due to environmental constraints. Regulated by both the <strong>U.S. Army Corps of Engineers<\/strong> and the <strong>State Water Board<\/strong>, the Poso Creek area could only be accessed during the dry season and only during daylight hours because it serves as a riparian habitat. Additionally, there were several measures required to further protect the creek bed, including perimeter controls, exclusionary wildlife fencing, spill preventative measures and constant soil management.<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                I am extremely proud of what we have accomplished here. We have an outstanding team of professionals that have worked on the Poso Creek overpass seven days a week, all summer, in order to ensure the bridge superstructure was completed prior to October 15. It is the result of a committed team that cares about its work and the project.            <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\">Antonio Canete<\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                        CEO of CRB                    <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>In July, crews performed the largest single concrete placement to date, with more than 100 trucks placing over <strong>1,000 cubic yards of concrete<\/strong> to form the deck of the superstructure. In August, crews poured an additional 535 cubic yards of concrete to form the east and west stem walls of the viaduct.<\/p>\n<p>Located in Kern County, the massive viaduct \u2013 240 feet long and 56 feet wide \u2013 will carry high-speed rail trains over Poso Creek. California High-Speed Rail is<strong> the biggest infrastructure project in California and one of the biggest in the United States<\/strong> as well. Construction Package 4, which CRB is building, is 21 miles in length and started in 2016, with a current total construction value of $560 million.<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                We cannot overstate the magnitude of this milestone and this project. Our work on the first high-speed rail project in North America positions Ferrovial Construction in an elite group of firms that have had the opportunity to dramatically transform mobility through high-speed rail.            <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\">Jose Vicente Baraja<\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                        Ferrovial Construction\u2019s Regional Director for the Western U.S. and Canada and Corporate Development &amp; Strategy Director for North America.                    <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>Construction Package 4 of California High-Speed Rail is estimated to be completed early 2022. Since inception, this segment of the project has employed over <strong>300 subcontractors<\/strong>, all of whom continued to work throughout the COVID-19 pandemic as \u201cessential workers.\u201d<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":100700,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1933,1471,1149,1174],"nivel-5":[2148],"nivel-1":[896],"nivel-3":[1322],"nivel-4":[2070],"class_list":["post-100712","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-design-and-construction","nivel-2-high-speed-rail","nivel-2-infrastructures","nivel-2-roadworks","nivel-5-ferrovial-construction","nivel-1-construction","nivel-3-united-states","nivel-4-california-en"],"acf":[],"yoast_head":"<title>California Rail Builders Completes Viaduct Structure in Record Time Ferrovial<\/title>\n<meta name=\"description\" content=\"California High-Speed Rail is the biggest infrastructure project in California and one of the biggest in the United States.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"California Rail Builders Completes Viaduct Structure in Record Time Ferrovial\" \/>\n<meta property=\"og:description\" content=\"California High-Speed Rail is the biggest infrastructure project in California and one of the biggest in the United States.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-21T07:45:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2020\/12\/dji-0667-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/\",\"name\":\"California Rail Builders Completes Viaduct Structure in Record Time Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/12\/15143136\/dji-0667-scaled.jpg\",\"datePublished\":\"2020-12-10T12:33:35+00:00\",\"dateModified\":\"2022-12-21T07:45:10+00:00\",\"description\":\"California High-Speed Rail is the biggest infrastructure project in California and one of the biggest in the United States.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/12\/15143136\/dji-0667-scaled.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/12\/15143136\/dji-0667-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"DCIM100MEDIADJI_0667.JPG\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"California Rail Builders Completes Viaduct Structure in Record Time\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"California Rail Builders Completes Viaduct Structure in Record Time Ferrovial","description":"California High-Speed Rail is the biggest infrastructure project in California and one of the biggest in the United States.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/","og_locale":"en_US","og_type":"article","og_title":"California Rail Builders Completes Viaduct Structure in Record Time Ferrovial","og_description":"California High-Speed Rail is the biggest infrastructure project in California and one of the biggest in the United States.","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-21T07:45:10+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2020\/12\/dji-0667-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/","name":"California Rail Builders Completes Viaduct Structure in Record Time Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/12\/15143136\/dji-0667-scaled.jpg","datePublished":"2020-12-10T12:33:35+00:00","dateModified":"2022-12-21T07:45:10+00:00","description":"California High-Speed Rail is the biggest infrastructure project in California and one of the biggest in the United States.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/12\/15143136\/dji-0667-scaled.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/12\/15143136\/dji-0667-scaled.jpg","width":2560,"height":1707,"caption":"DCIM100MEDIADJI_0667.JPG"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/california-rail-builders-completes-viaduct-structure-in-record-time\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"California Rail Builders Completes Viaduct Structure in Record Time"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/100712","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=100712"}],"version-history":[{"count":3,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/100712\/revisions"}],"predecessor-version":[{"id":100715,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/100712\/revisions\/100715"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/100700"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=100712"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=100712"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=100712"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=100712"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=100712"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=100712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}