{"id":101544,"date":"2021-03-05T14:10:31","date_gmt":"2021-03-05T13:10:31","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=new&#038;p=101544"},"modified":"2022-12-21T08:44:11","modified_gmt":"2022-12-21T07:44:11","slug":"farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/","title":{"rendered":"Farringdon Station Built by BAM Ferrovial Kier, First Central London Elizabeth Line Station Handed Over by Crossrail to TfL"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <ul>\n<li>Farringdon was the first central London project team to reach Stage Completion 3 (SC3) and T-12 status, which means it was 12 weeks away from being handed over to the infrastructure manager, Transport for London<\/li>\n<\/ul>\n<p><strong>Crossrail<\/strong> has handed over the <strong>Farringdon Elizabeth line station<\/strong>, built by the <strong>BAM<\/strong>, <strong>Ferrovial<\/strong>, <strong>Kier<\/strong> joint venture (Team BFK), to <strong>Transport for London<\/strong> (TfL), making it the first central London station to reach handover.<\/p>\n<p>This news follows a number of firsts for the BFK project team. Farringdon was<strong> the first central London project team to reach Stage Completion 3<\/strong> (SC3) and T-12 status, which means it was 12 weeks away from being handed over to the infrastructure manager, Transport for London. It was also the first and only Elizabeth line station to achieve the <strong>BREEAM excellent accreditation<\/strong> in its post-construction review. It achieved this for its dedication to the environment and social sustainability through the design and construction stages.<\/p>\n<p>Throughout the delivery of Farringdon station, there were <strong>82 apprentices<\/strong> and<strong> 10,000 people<\/strong> were inducted into Team BFK. The project team showed continued enthusiasm and commitment to innovation, as well as using new build techniques. This commitment resulted in a number of awards and was demonstrated in the team\u2019s dedication to implementing BIM across the project.<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                Farringdon has led the way by becoming the first central London Elizabeth line station to hand over from Crossrail to TfL. The commitment from every single member of the BFK team as we have worked collaboratively with our client Crossrail throughout has been nothing short of commendable. The legacy of the construction phase \u2013 innovation, engineering, social impact will endure for generations to come. It has been an extraordinary scheme to deliver and I would like to thank all involved for their strength, resilience, and determination to get the station handed over and to the excellent standard we have achieved.            <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\">Jose Antonio Pariente<\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                        Project Director, BAM Ferrovial Kier                    <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>When the Elizabeth line opens, Farringdon station will be one of the busiest in the UK, connecting with Thameslink and the London Underground.<\/p>\n<p>Photo \u00a9 Crossrail Ltd<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1009613,"featured_media":101547,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1149,2092,1131,1169],"nivel-5":[2148,1706],"nivel-1":[896],"nivel-3":[1327],"nivel-4":[2041],"class_list":["post-101544","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-infrastructures","nivel-2-projects","nivel-2-train-station","nivel-2-works","nivel-5-ferrovial-construction","nivel-5-team-bfk-en","nivel-1-construction","nivel-3-uk","nivel-4-london"],"acf":[],"yoast_head":"<title>Farringdon Station Built by BAM Ferrovial Kier, First Central London Elizabeth Line Station Handed Over by Crossrail to TfL Ferrovial<\/title>\n<meta name=\"description\" content=\"Crossrail has handed over the Farringdon Elizabeth line station, built by the BAM, Ferrovial, Kier joint venture (Team BFK), to Transport for London.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Farringdon Station Built by BAM Ferrovial Kier, First Central London Elizabeth Line Station Handed Over by Crossrail to TfL Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Crossrail has handed over the Farringdon Elizabeth line station, built by the BAM, Ferrovial, Kier joint venture (Team BFK), to Transport for London.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-21T07:44:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2021\/03\/50515025828-e28e8ff9ea-o-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1706\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/\",\"name\":\"Farringdon Station Built by BAM Ferrovial Kier, First Central London Elizabeth Line Station Handed Over by Crossrail to TfL Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/03\/15143047\/50515025828-e28e8ff9ea-o-scaled.jpg\",\"datePublished\":\"2021-03-05T13:10:31+00:00\",\"dateModified\":\"2022-12-21T07:44:11+00:00\",\"description\":\"Crossrail has handed over the Farringdon Elizabeth line station, built by the BAM, Ferrovial, Kier joint venture (Team BFK), to Transport for London.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/03\/15143047\/50515025828-e28e8ff9ea-o-scaled.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/03\/15143047\/50515025828-e28e8ff9ea-o-scaled.jpg\",\"width\":2560,\"height\":1706,\"caption\":\"BFK Crossrail C435 October 2020\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Farringdon Station Built by BAM Ferrovial Kier, First Central London Elizabeth Line Station Handed Over by Crossrail to TfL\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Farringdon Station Built by BAM Ferrovial Kier, First Central London Elizabeth Line Station Handed Over by Crossrail to TfL Ferrovial","description":"Crossrail has handed over the Farringdon Elizabeth line station, built by the BAM, Ferrovial, Kier joint venture (Team BFK), to Transport for London.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/","og_locale":"en_US","og_type":"article","og_title":"Farringdon Station Built by BAM Ferrovial Kier, First Central London Elizabeth Line Station Handed Over by Crossrail to TfL Ferrovial","og_description":"Crossrail has handed over the Farringdon Elizabeth line station, built by the BAM, Ferrovial, Kier joint venture (Team BFK), to Transport for London.","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-21T07:44:11+00:00","og_image":[{"width":2560,"height":1706,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2021\/03\/50515025828-e28e8ff9ea-o-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/","name":"Farringdon Station Built by BAM Ferrovial Kier, First Central London Elizabeth Line Station Handed Over by Crossrail to TfL Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/03\/15143047\/50515025828-e28e8ff9ea-o-scaled.jpg","datePublished":"2021-03-05T13:10:31+00:00","dateModified":"2022-12-21T07:44:11+00:00","description":"Crossrail has handed over the Farringdon Elizabeth line station, built by the BAM, Ferrovial, Kier joint venture (Team BFK), to Transport for London.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/03\/15143047\/50515025828-e28e8ff9ea-o-scaled.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/03\/15143047\/50515025828-e28e8ff9ea-o-scaled.jpg","width":2560,"height":1706,"caption":"BFK Crossrail C435 October 2020"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/farringdon-station-first-central-london-elizabeth-line-station-handed-over-by-crossrail-to-tfl\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Farringdon Station Built by BAM Ferrovial Kier, First Central London Elizabeth Line Station Handed Over by Crossrail to TfL"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/101544","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"author":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/users\/1009613"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=101544"}],"version-history":[{"count":3,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/101544\/revisions"}],"predecessor-version":[{"id":104301,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/101544\/revisions\/104301"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/101547"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=101544"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=101544"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=101544"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=101544"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=101544"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=101544"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}