{"id":102983,"date":"2021-07-14T09:52:41","date_gmt":"2021-07-14T07:52:41","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=new&#038;p=102983"},"modified":"2022-12-21T08:42:07","modified_gmt":"2022-12-21T07:42:07","slug":"completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/","title":{"rendered":"Completed the remodeling of the Benalm\u00e1dena East junction to relieve traffic congestion on the AP-7 highway."},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>Ferrovial Construction responds to traffic flow demands in one of the most populated areas of the Costa del Sol. The improvements to the toll-free zone of the AP-7 freeway at the Arroyo de la Miel junction will solve the traffic capacity problems and will put an end to the frequent traffic jams in the lanes and on the shoulders of both lanes of the road.<\/p>\n<p>The remodeling project of the existing junction at KP 222 of the AP-7 has included the construction of a depressed traffic circle, new branches and braided lanes on the trunk of the AP-7 up to the accesses to the service station at KP 223. The remodeling of the previous configuration of the junction, which was a depressed diamond with weights, <strong>meets the objective of improving the operation of the junction.<\/strong><\/p>\n<p>To successfully complete this junction, popularly known as the Arroyo de la Miel junction, it has been necessary to modify 2.7 kilometers of the total length of the project and to carry out two underpasses, 700 linear meters of walls and 3.6 kilometers of branches and braided lanes.<\/p>\n<p>Due to the increase in traffic on that road since the project was drafted in 2015, it was necessary to modify the initial approach and draft a new project in 2018 with changes to the temporary detours and adjustments to the layout. In this way<strong>, it was possible to keep the existing branches operational during most of the work, significantly improving the operating conditions of the AP-7 during construction.<\/strong> This change also involved the modification of drainage, walls and structures. The total project budget, including modifications, was \u20ac10,950,732.32.<\/p>\n<p>Another of the actions carried out by Ferrovial Construction\u2019s team, during the execution of the project, was to review the pavements with the current traffic levels and to reduce as much as possible the excavations in rock, since it was not advisable to fly due to the proximity of traffic, houses and sensitive facilities.<\/p>\n<p>The inauguration ceremony was attended, among other authorities, by <strong>Pedro Fern\u00e1ndez Pe\u00f1alver,<\/strong> Government Delegate in Andalusia, <strong>Te\u00f3filo Ruiz Municio,<\/strong> Government Subdelegate in M\u00e1laga, J<strong>avier<\/strong> <strong>Herrero Lizano,<\/strong> General Director of Roads, <strong>Salvador Fern\u00e1ndez Quesada,<\/strong> Head of the Road Demarcation in Eastern Andalusia, and <strong>Manuel Carazo Carazo,<\/strong> Director of the Works.\u00a0 On behalf of Ferrovial Construction, <strong>Juan Lozano Villalta,<\/strong> director of Civil Works Construction, <strong>Alberto Torres Moreno,<\/strong> director of the Southern Region, <strong>Celestino Orz\u00e1ez Alc\u00e1zar,<\/strong> head of the Works Group, <strong>Manuel L\u00f3pez Olmedo,<\/strong> works manager, <strong>Antonio Guarde\u00f1o M\u00e1rmol,<\/strong> head of Production, <strong>Antonio Moreno Garc\u00eda,<\/strong> works manager, and <strong>David Mata Ortega,<\/strong> works administrator, were present. Absent from the ceremony, but also participating in the work, were <strong>Javier Torroja Fungairi\u00f1o,<\/strong> manager, and <strong>H\u00e9ctor Peralta Moreno,<\/strong> head of Topography.<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":102980,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1925,1099,1169],"nivel-5":[2148],"nivel-1":[896],"nivel-3":[1321],"nivel-4":[2286],"class_list":["post-102983","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-motorways","nivel-2-roads","nivel-2-works","nivel-5-ferrovial-construction","nivel-1-construction","nivel-3-spain","nivel-4-malaga-en"],"acf":[],"yoast_head":"<title>Completed the remodeling of the Benalm\u00e1dena East junction to relieve traffic congestion on the AP-7 highway. Ferrovial<\/title>\n<meta name=\"description\" content=\"Ferrovial Construction responds to traffic flow demands in one of the most populated areas of the Costa del Sol.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Completed the remodeling of the Benalm\u00e1dena East junction to relieve traffic congestion on the AP-7 highway. Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Ferrovial Construction responds to traffic flow demands in one of the most populated areas of the Costa del Sol.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-21T07:42:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2021\/07\/microsoftteams-image-4-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1705\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/\",\"name\":\"Completed the remodeling of the Benalm\u00e1dena East junction to relieve traffic congestion on the AP-7 highway. Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142756\/microsoftteams-image-4-scaled.jpg\",\"datePublished\":\"2021-07-14T07:52:41+00:00\",\"dateModified\":\"2022-12-21T07:42:07+00:00\",\"description\":\"Ferrovial Construction responds to traffic flow demands in one of the most populated areas of the Costa del Sol.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142756\/microsoftteams-image-4-scaled.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142756\/microsoftteams-image-4-scaled.jpg\",\"width\":2560,\"height\":1705,\"caption\":\"Remodelaci\u00f3n enlace Benalm\u00e1dena AP-7\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Completed the remodeling of the Benalm\u00e1dena East junction to relieve traffic congestion on the AP-7 highway.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Completed the remodeling of the Benalm\u00e1dena East junction to relieve traffic congestion on the AP-7 highway. Ferrovial","description":"Ferrovial Construction responds to traffic flow demands in one of the most populated areas of the Costa del Sol.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/","og_locale":"en_US","og_type":"article","og_title":"Completed the remodeling of the Benalm\u00e1dena East junction to relieve traffic congestion on the AP-7 highway. Ferrovial","og_description":"Ferrovial Construction responds to traffic flow demands in one of the most populated areas of the Costa del Sol.","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-21T07:42:07+00:00","og_image":[{"width":2560,"height":1705,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2021\/07\/microsoftteams-image-4-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/","name":"Completed the remodeling of the Benalm\u00e1dena East junction to relieve traffic congestion on the AP-7 highway. Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142756\/microsoftteams-image-4-scaled.jpg","datePublished":"2021-07-14T07:52:41+00:00","dateModified":"2022-12-21T07:42:07+00:00","description":"Ferrovial Construction responds to traffic flow demands in one of the most populated areas of the Costa del Sol.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142756\/microsoftteams-image-4-scaled.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/07\/15142756\/microsoftteams-image-4-scaled.jpg","width":2560,"height":1705,"caption":"Remodelaci\u00f3n enlace Benalm\u00e1dena AP-7"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-the-ap-7-highway-completed-the-remodeling-of-the-benalmadena-east-junction-to-relieve-traffic-congestion-on-t\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Completed the remodeling of the Benalm\u00e1dena East junction to relieve traffic congestion on the AP-7 highway."}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/102983","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=102983"}],"version-history":[{"count":2,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/102983\/revisions"}],"predecessor-version":[{"id":102989,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/102983\/revisions\/102989"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/102980"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=102983"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=102983"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=102983"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=102983"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=102983"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=102983"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}