{"id":106457,"date":"2022-04-28T12:45:11","date_gmt":"2022-04-28T10:45:11","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=new&#038;p=106457"},"modified":"2022-12-20T18:08:33","modified_gmt":"2022-12-20T17:08:33","slug":"budimex-to-build-8-km-of-new-tramway-line-in-warsaw","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/","title":{"rendered":"Budimex to build 8 km of new tramway line in Warsaw"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <div><span class=\"ms-rteFontSize-2\">The new route will enable residents to reach the city center quickly and conveniently via greenways and up to\u00a0<strong>488 trees will be planted along the route.<\/strong>\u00a0The cost of construction exceeds 147 million euros, and will be co-financed by the European Union.<\/span><\/div>\n<h2><\/h2>\n<h2>What will the tramway to Wilan\u00f3w look like?<\/h2>\n<div>\n<div><span class=\"ms-rteFontSize-2\">The new route will start at the junction of\u00a0<strong>Pu\u0142awska<\/strong>\u00a0and\u00a0<strong>Goworka\u00a0<\/strong>streets. The reconstruction will also cover the existing section of the streetcar route from\u00a0<strong>Rakowiecka\u00a0<\/strong>Street to Plac Unii\u00a0<strong>Lubelskiej<\/strong>. The tramway will run along\u00a0<strong>Goworka\u00a0<\/strong>and\u00a0<strong>Spacerowa\u00a0<\/strong>Streets, which will have a gradient of up to 22 meters in the direction of Lower\u00a0<strong>Mokot\u00f3w<\/strong>. The line will then run in a straight line along\u00a0<strong>Belwederska\u00a0<\/strong>and\u00a0<strong>Sobieskiego\u00a0<\/strong>streets in the direction of\u00a0<strong>Miasteczko\u00a0<\/strong><strong>Wilan\u00f3w<\/strong>. The terminus of the two-way streetcars will be located at the intersection of\u00a0<strong>Rzeczypospolitej\u00a0<\/strong>and\u00a0<strong>Branickiego\u00a0<\/strong>avenues.<\/span><\/div>\n<div><span class=\"ms-rteFontSize-2\">The stops on the\u00a0<strong>new route will be adapted to the needs of disabled people and will be equipped with electronic information panels with timetables\u00a0<\/strong>(panels connected to the satellite system that calculate the travel time of streetcars in line). In total,\u00a0<strong>31 stops<\/strong>\u00a0will be created. A green wave system will operate along the entire route, so that streetcars will not have to wait for the traffic light to turn green before crossing. Three new traction substations will be built as part of the project, including Warsaw&#8217;s first subway substation. Its task will be to supply the streetcars with electricity.<\/span><\/div>\n<\/div>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                This is one of the largest tramway investments being made in Poland and, at the same time, a big step towards the development of low-emission public transport in Warsaw. We have extensive experience in projects of this type &#8211; in recent years, we have successfully built new streetcar lines in Gorz\u00f3w Wielkopolski, Krakow and Olsztyn            <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\"> Artur Popko<\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                        President of Budimex SA                    <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <h2><span class=\"ms-rteFontSize-2 ms-rteThemeForeColor-5-0\"><strong>Travel time<\/strong><\/span><\/h2>\n<div><span class=\"ms-rteFontSize-2\">The new route means\u00a0<strong>considerable time savings for\u00a0<\/strong><strong>Wilan\u00f3w\u00a0<\/strong><strong>residents\u00a0<\/strong>commuting to the center of Warsaw. The streetcar ride from this neighborhood to the Centrum metro station takes about\u00a0<strong>30\u00a0<\/strong><strong>minutes<\/strong>. By way of comparison, drivers currently have to spend up to 45 minutes on the same route during rush hour.<\/span><\/div>\n<h2><span class=\"ms-rteFontSize-2 ms-rteThemeForeColor-5-0\"><strong>Greenways<\/strong><\/span><\/h2>\n<div><span class=\"ms-rteFontSize-2\">During the construction of the tramway route to\u00a0<strong>Wilan\u00f3w<\/strong>, green track technology will be applied. The new tracks will be planted with sedum, a plant that is resistant to high temperatures and does not need to be watered. The total length of the greenways on the route to Wilan\u00f3w will exceed 10 km. At present, there are more than 25 km of green tracks in Warsaw. The tramway engineers attached great importance to vegetation in the design of the tramway to Wilan\u00f3w. Some solutions have never been used before in the construction of streetcar routes. Some of the platforms will have trees, there will be linden and sedum trees next to the tracks, and trees will be planted in a special way in the narrowest places. A total of 488 trees will be planted along the streetcar route to Wilan\u00f3w. The parameters of the trees will be in accordance with Warsaw&#8217;s green space design standards.<\/span><\/div>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                The project completion date is the end of January 2024. The start of works is planned within 5 months from the date of signing the contract. Within the scope of the project, we will build 8 km of streetcar line and 4 crossings. The scope of works includes, among other things, construction of drainage, reconstruction of rainwater and sanitary networks, gas network, reconstruction of electricity and telecommunication networks, construction of traction network, construction of lighting, reconstruction of traffic lights and construction of three traction substations            <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\">Artur Popko<\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                         President of Budimex SA                    <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n    <section class=\"photo-gallery \" id=\"\" name = \"\">\n        <div class=\"container container--narrow container--p-10\">\n            <div class=\"photo-gallery__carousel\">\n                                    <img decoding=\"async\"\n                        src=\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15142039\/buidimex-contrato-tranvia-varsovia-20221.jpg\"\n                        alt=\"ARTUR POPKO PRESIDENTE DE BUDIMEX\"\n                        class=\"photo-gallery__image\"\n                        data-title=\"Buidimex - Contrato tranv\u00eda Varsovia 2022.1\" \/>\n                                    <img decoding=\"async\"\n                        src=\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15142038\/buidimex-contrato-tranvia-varsovia-20222.jpg\"\n                        alt=\"ARTUR POPKO PRESIDENTE DE BUDIMEX\"\n                        class=\"photo-gallery__image\"\n                        data-title=\"Buidimex - Contrato tranv\u00eda Varsovia 2022.2\" \/>\n                                    <img decoding=\"async\"\n                        src=\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15142037\/buidimex-contrato-tranvia-varsovia-20223.jpg\"\n                        alt=\"ARTUR POPKO PRESIDENTE DE BUDIMEX\"\n                        class=\"photo-gallery__image\"\n                        data-title=\"Buidimex - Contrato tranv\u00eda Varsovia 2022.3\" \/>\n                            <\/div>\n            <div class=\"photo-gallery__description-container\">\n                <div class=\"photo-gallery__info\">\n                    <span class=\"photo-gallery__caption\">PHOTO GALLERY<\/span>\n                    <p class=\"photo-gallery__title\">Budimex to build 8 km of new tramway line in Warsaw<\/p>\n                <\/div>\n                <span class=\"icon-gallery-white photo-gallery__icon\"><\/span>\n            <\/div>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":106439,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1101,1149,2092,1216,1203,1148,1224],"nivel-5":[],"nivel-1":[896],"nivel-3":[],"nivel-4":[],"class_list":["post-106457","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-contracts","nivel-2-infrastructures","nivel-2-projects","nivel-2-trams","nivel-2-transport-systems","nivel-2-urban-infrastructure","nivel-2-urban-innovation","nivel-1-construction"],"acf":[],"yoast_head":"<title>Budimex to build 8 km of new tramway line in Warsaw Ferrovial<\/title>\n<meta name=\"description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Budimex to build 8 km of new tramway line in Warsaw Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-20T17:08:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2022\/04\/buidimex-contrato-tranvia-varsovia-20222.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2400\" \/>\n\t<meta property=\"og:image:height\" content=\"1316\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/\",\"name\":\"Budimex to build 8 km of new tramway line in Warsaw Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15142038\/buidimex-contrato-tranvia-varsovia-20222.jpg\",\"datePublished\":\"2022-04-28T10:45:11+00:00\",\"dateModified\":\"2022-12-20T17:08:33+00:00\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15142038\/buidimex-contrato-tranvia-varsovia-20222.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15142038\/buidimex-contrato-tranvia-varsovia-20222.jpg\",\"width\":2400,\"height\":1316,\"caption\":\"ARTUR POPKO PRESIDENTE DE BUDIMEX\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Budimex to build 8 km of new tramway line in Warsaw\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Budimex to build 8 km of new tramway line in Warsaw Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/","og_locale":"en_US","og_type":"article","og_title":"Budimex to build 8 km of new tramway line in Warsaw Ferrovial","og_description":"Sala de prensa Ferrovial | \u00daltimas noticias","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-20T17:08:33+00:00","og_image":[{"width":2400,"height":1316,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2022\/04\/buidimex-contrato-tranvia-varsovia-20222.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/","name":"Budimex to build 8 km of new tramway line in Warsaw Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15142038\/buidimex-contrato-tranvia-varsovia-20222.jpg","datePublished":"2022-04-28T10:45:11+00:00","dateModified":"2022-12-20T17:08:33+00:00","description":"Sala de prensa Ferrovial | \u00daltimas noticias","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15142038\/buidimex-contrato-tranvia-varsovia-20222.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2022\/04\/15142038\/buidimex-contrato-tranvia-varsovia-20222.jpg","width":2400,"height":1316,"caption":"ARTUR POPKO PRESIDENTE DE BUDIMEX"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/budimex-to-build-8-km-of-new-tramway-line-in-warsaw\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Budimex to build 8 km of new tramway line in Warsaw"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/106457","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=106457"}],"version-history":[{"count":3,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/106457\/revisions"}],"predecessor-version":[{"id":110990,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/106457\/revisions\/110990"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/106439"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=106457"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=106457"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=106457"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=106457"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=106457"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=106457"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}