{"id":5024,"date":"1998-10-14T00:00:00","date_gmt":"1998-10-14T00:00:00","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/"},"modified":"2022-12-21T12:02:51","modified_gmt":"2022-12-21T11:02:51","slug":"ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/","title":{"rendered":"Ferrovial, Cadagua, FCC and PSA to build the 6,400 million-peseta sewage plant at Arroyo Culebro in Madrid"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p><strong>Ferrovial, Cadagua, FCC and PSA to build the 6,400 million-peseta sewage plant at Arroyo Culebro in Madrid<br \/>\n<\/strong><br \/>\nThe temporary consortium formed by Ferrovial-Cadagua and FCC-PSA will be commissioned the project and execution of the works on the Sewage Processing Plant in the Upper Middle Basin of Arroyo Culebro, in the Fuenlabrada sector of Madrid. The project budget is 6,393 million pesetas it has a 48-month construction deadline and the works include execution of the collectors and operation of the plant during the functional trial stage.<\/p>\n<p>The plant, with a capacity of 129,600 m\u00b3\/water per day, has a high technological component, which includes physical and chemical preliminary processing, two stage biological processing and tertiary processing. The project also includes recovery of electric energy from biogas obtained from digestion of the sludge.<\/p>\n<p><strong>Energy recovery<\/strong><\/p>\n<p>Cadagua has important references that include this procedure, such as the South Sewage Plant and that at Butarque, both in Madrid; the Sewage Plant in Villap\u00e9rez, in Asturias; at Lorca, in Murcia; at Quart-Benager, in Valencia; at Arazuri, in Navarre. Cadagua has introduced spearhead technology in these, through its agreement with Stewart Scott from South Africa, applying a state- of- the- art nutrient renewal technology for urban sewage. This system allows Cadagua to generate 11 Mw from biogas overall, at the plants it operates in Spain.<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[],"nivel-5":[],"nivel-1":[896],"nivel-3":[],"nivel-4":[],"class_list":["post-5024","new","type-new","status-publish","hentry","nivel-1-construction"],"acf":[],"yoast_head":"<title>Ferrovial, Cadagua, FCC and PSA to build the 6,400 million-peseta sewage plant at Arroyo Culebro in Madrid Ferrovial<\/title>\n<meta name=\"description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ferrovial, Cadagua, FCC and PSA to build the 6,400 million-peseta sewage plant at Arroyo Culebro in Madrid Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-21T11:02:51+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/\",\"name\":\"Ferrovial, Cadagua, FCC and PSA to build the 6,400 million-peseta sewage plant at Arroyo Culebro in Madrid Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"datePublished\":\"1998-10-14T00:00:00+00:00\",\"dateModified\":\"2022-12-21T11:02:51+00:00\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ferrovial, Cadagua, FCC and PSA to build the 6,400 million-peseta sewage plant at Arroyo Culebro in Madrid\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Ferrovial, Cadagua, FCC and PSA to build the 6,400 million-peseta sewage plant at Arroyo Culebro in Madrid Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/","og_locale":"en_US","og_type":"article","og_title":"Ferrovial, Cadagua, FCC and PSA to build the 6,400 million-peseta sewage plant at Arroyo Culebro in Madrid Ferrovial","og_description":"Sala de prensa Ferrovial | \u00daltimas noticias","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-21T11:02:51+00:00","twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/","name":"Ferrovial, Cadagua, FCC and PSA to build the 6,400 million-peseta sewage plant at Arroyo Culebro in Madrid Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"datePublished":"1998-10-14T00:00:00+00:00","dateModified":"2022-12-21T11:02:51+00:00","description":"Sala de prensa Ferrovial | \u00daltimas noticias","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-cadagua-fcc-and-psa-to-build-the-6400-million-peseta-sewage-plant-at-arroyo-culebro-in-madrid\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Ferrovial, Cadagua, FCC and PSA to build the 6,400 million-peseta sewage plant at Arroyo Culebro in Madrid"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/5024","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=5024"}],"version-history":[{"count":1,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/5024\/revisions"}],"predecessor-version":[{"id":119287,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/5024\/revisions\/119287"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=5024"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=5024"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=5024"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=5024"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=5024"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=5024"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}