{"id":61081,"date":"2019-01-21T13:25:55","date_gmt":"2019-01-21T12:25:55","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=new&#038;p=61081"},"modified":"2022-12-21T09:08:33","modified_gmt":"2022-12-21T08:08:33","slug":"completion-of-the-tunnel-connecting-the-rodalies-r2-line","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/","title":{"rendered":"Completion of Connection Tunnel on Rodalies Line that Will Join Terminal at Barcelona-El Prat Airport with City"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>Among those who attended the event were Sonia Corrochano, Director of the <a href=\"http:\/\/www.aena.es\/es\/aeropuerto-barcelona\/index.html\" target=\"_blank\" rel=\"noopener\">Barcelona Airport<\/a> (Aena); Montserrat Garc\u00eda, Sub-delegate of the Catalonian Administration; Juan Antonio Hermoso, Deputy Director of Construction IV at Adif; Ismael Romero, Project Manager (Ineco); and Juan Manuel Mart\u00ednez, Contract Manager (Technical Supervision SEITT). Miguel \u00c1ngel Valencia, Manager, and Francesc Medall, Site Manager, along with others, attended on behalf of <a href=\"https:\/\/www.ferrovial.com\/es\/lineas-de-negocio\/construccion\/sobre-construccion\/\" target=\"_blank\" rel=\"noopener\">Ferrovial Agroman<\/a>.<\/p>\n<p>The <strong>3,048-meter-long tunnel <\/strong>used &#8220;Gala,&#8221;<strong> the tunneling machine measuring 10.6 m in diameter<\/strong> that went through Terminal 2 as well as the Airport&#8217;s Main Runway, the two points most notable for their uniqueness. Its dismantling is currently underway, and it will resume working on the site of the future Multimodal Station at Terminal 2.<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"image-section \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n        <figure class=\"image-section__figure\">\n            <img decoding=\"async\" src=\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/01\/15152422\/equipo-proyecto.jpg\" title=\"Rodalies Tunnel project team\" alt=\"Rodalies Tunnel project team\" class=\"image-section__image\">\n                    <\/figure>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <h2><strong>Project description<\/strong><\/h2>\n<p>The project will connect the Barcelona-El Prat Airport by railway at <strong>a total length of 4,495 m<\/strong>, 3,385 m of which <strong>are underground<\/strong>, and of those, <strong>3,048 m are dug with the tunneling machine<\/strong>. The tunnel is excavated with an <a href=\"https:\/\/en.wikipedia.org\/wiki\/Earth_pressure_balance\" target=\"_blank\" rel=\"nofollow noopener\">EPB<\/a> ( Pressure Balanced) tunneling machine with a shield on front, which has an excavation diameter of 10.6 m and a 9.6 m interior diameter.<\/p>\n<p>Excavation is underway in the municipal districts of El Prat and Sant Boi, and <strong>the new access will have stations at both terminals of the Barcelona Airport<\/strong>. The first stop is located at the future T2 Multimodal Hub, as the current connecting gateway between the current Commuter Rail Station and T2 will be gone. The route will then run under the airfield to connect with the New Terminal.<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"image-section \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n        <figure class=\"image-section__figure\">\n            <img decoding=\"async\" src=\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/01\/15152422\/tunel.jpg\" title=\"Rodalies Tunnel\" alt=\"Rodalies Tunnel\" class=\"image-section__image\">\n                    <\/figure>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <h2><strong>Current situation<\/strong><\/h2>\n<p>As of today, the first kilometer of the tunnel, which runs from where the line connects with the commuter rail system to the opening to the tunnel shaft, is totally finished, <strong>since the sheet piling, walls, and slabs for the section that will run in open air have been done<\/strong>; as well as the screens, the jet-grouting, and the cut-and cover tunnel&#8217;s upper and lower slabs. Excavation on this stretch began in September of 2017 with the system for the tunneling machine and the necessary additions for excavation (conveyor belts, ditches, building voussoirs, etc).<\/p>\n<p><strong>Excavation of the area that will be the future commuter rail station at Terminal 2 <\/strong>is currently underway, with the screens, jet-grouting, and upper and middle slabs already done.<\/p>\n<p>&nbsp;<\/p>\n<p><iframe loading=\"lazy\" src=\"https:\/\/www.youtube.com\/embed\/PxsO3slIfqQ\" width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":59021,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1137,1213,1192,1486,1220],"nivel-5":[2148],"nivel-1":[896],"nivel-3":[1321],"nivel-4":[1824,1794],"class_list":["post-61081","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-facilities","nivel-2-passenger-transport","nivel-2-rail-network","nivel-2-sustainability","nivel-2-tunnels","nivel-5-ferrovial-construction","nivel-1-construction","nivel-3-spain","nivel-4-barcelona-en","nivel-4-catalonia"],"acf":[],"yoast_head":"<title>Completion of Connection Tunnel on Rodalies Line<\/title>\n<meta name=\"description\" content=\"The project that will connect the Barcelona-El Prat Airport by train took a monumental step forward when the end of the connecting tunnel was reached.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Completion of Connection Tunnel on Rodalies Line\" \/>\n<meta property=\"og:description\" content=\"The project that will connect the Barcelona-El Prat Airport by train took a monumental step forward when the end of the connecting tunnel was reached.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-21T08:08:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2019\/01\/tuneladora-e1548062014617.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1391\" \/>\n\t<meta property=\"og:image:height\" content=\"674\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/\",\"name\":\"Completion of Connection Tunnel on Rodalies Line\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/01\/15152420\/tuneladora-e1548062014617.jpg\",\"datePublished\":\"2019-01-21T12:25:55+00:00\",\"dateModified\":\"2022-12-21T08:08:33+00:00\",\"description\":\"The project that will connect the Barcelona-El Prat Airport by train took a monumental step forward when the end of the connecting tunnel was reached.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/01\/15152420\/tuneladora-e1548062014617.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/01\/15152420\/tuneladora-e1548062014617.jpg\",\"width\":1391,\"height\":674,\"caption\":\"Rodalies Tunnel Barcelona El Prat\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Completion of Connection Tunnel on Rodalies Line that Will Join Terminal at Barcelona-El Prat Airport with City\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Completion of Connection Tunnel on Rodalies Line","description":"The project that will connect the Barcelona-El Prat Airport by train took a monumental step forward when the end of the connecting tunnel was reached.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/","og_locale":"en_US","og_type":"article","og_title":"Completion of Connection Tunnel on Rodalies Line","og_description":"The project that will connect the Barcelona-El Prat Airport by train took a monumental step forward when the end of the connecting tunnel was reached.","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-21T08:08:33+00:00","og_image":[{"width":1391,"height":674,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2019\/01\/tuneladora-e1548062014617.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/","name":"Completion of Connection Tunnel on Rodalies Line","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/01\/15152420\/tuneladora-e1548062014617.jpg","datePublished":"2019-01-21T12:25:55+00:00","dateModified":"2022-12-21T08:08:33+00:00","description":"The project that will connect the Barcelona-El Prat Airport by train took a monumental step forward when the end of the connecting tunnel was reached.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/01\/15152420\/tuneladora-e1548062014617.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/01\/15152420\/tuneladora-e1548062014617.jpg","width":1391,"height":674,"caption":"Rodalies Tunnel Barcelona El Prat"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/completion-of-the-tunnel-connecting-the-rodalies-r2-line\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Completion of Connection Tunnel on Rodalies Line that Will Join Terminal at Barcelona-El Prat Airport with City"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/61081","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=61081"}],"version-history":[{"count":1,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/61081\/revisions"}],"predecessor-version":[{"id":110535,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/61081\/revisions\/110535"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/59021"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=61081"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=61081"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=61081"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=61081"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=61081"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=61081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}