{"id":6168,"date":"2016-10-21T00:00:00","date_gmt":"2016-10-21T00:00:00","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/"},"modified":"2022-12-21T09:55:25","modified_gmt":"2022-12-21T08:55:25","slug":"ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/","title":{"rendered":"Ferrovial Servi\u00e7os awarded the public contract for operation of the LIPOR II landfill"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p><strong>CITRUP<\/strong> \u2013 a company in which Ferrovial Servi\u00e7os (the portuguese subsidiary) has a 70% stake, with the other 30% being held by the Portuguese company <a title=\"SUMA Portugal\" href=\"http:\/\/www.suma.pt\/en\/profile.html\" target=\"_blank\" rel=\"dofollow\">Urban Services and the Environment (SUMA)<\/a><strong> \u2013,<\/strong> has been awarded the contract for management of the Lipor II controlled landfill site, located in the city of Maia, in the north of Portugal.<\/p>\n<p>CITRUP has been maintaining the Maia landfill site at the <a title=\"Lipor Portugal\" href=\"http:\/\/www.lipor.pt\/en\/\" target=\"_blank\" rel=\"dofollow\">Lipor II<\/a> facilities for over 15 years. During this period, 448,000 tonnes of ash and 589,000 tonnes of municipal solid waste (MSW) have been deposited in the landfill, and 121,000m<sup>3<\/sup> of leachate have been treated.<\/p>\n<p>Over the life of this new contract it is expected that a further 90,000 tonnes of MSW will be deposited and 30,000 m<sup>3<\/sup> of leachate treated.<\/p>\n<p>This controlled landfill was designed to take the solid waste from the waste-to-energy plant. The Maia landfill is an <strong>essential infrastructure<\/strong> for integrated management of municipal solid waste at LIPOR. Located next to the energy recovery plant, it occupies an area of approximately 8 hectares (aprox. 20 acres).<\/p>\n<h2><strong>About CITRUP<\/strong><\/h2>\n<p>CITRUP uses the latest technology for environmental and public health protection. The company is responsible for safety, reception of waste products, and treatment of leachate and biogas. The safety systems in place at this landfill put it on a par with the best in Europe.<\/p>\n<p>CITRUP is a consortium made up by Resin, France Dechets, Engil and Serurb for the design, construction and operation of a controlled landfill next to the waste-to-energy plant at LIPOR (Intermunicipal Waste Management of Greater Porto).<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":6169,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1101,1149,1845,1847,1476],"nivel-5":[],"nivel-1":[],"nivel-3":[1326],"nivel-4":[],"class_list":["post-6168","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-contracts","nivel-2-infrastructures","nivel-2-maintenance","nivel-2-management","nivel-2-waste","nivel-3-portugal-en"],"acf":[],"yoast_head":"<title>Ferrovial Servi\u00e7os awarded the public contract for operation of the LIPOR II landfill Ferrovial<\/title>\n<meta name=\"description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ferrovial Servi\u00e7os awarded the public contract for operation of the LIPOR II landfill Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-21T08:55:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2018\/07\/d9g_h182-citrup-previsualizacion-e1476796993807.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"570\" \/>\n\t<meta property=\"og:image:height\" content=\"380\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/\",\"name\":\"Ferrovial Servi\u00e7os awarded the public contract for operation of the LIPOR II landfill Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151946\/d9g_h182-citrup-previsualizacion-e1476796993807.jpg\",\"datePublished\":\"2016-10-21T00:00:00+00:00\",\"dateModified\":\"2022-12-21T08:55:25+00:00\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151946\/d9g_h182-citrup-previsualizacion-e1476796993807.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151946\/d9g_h182-citrup-previsualizacion-e1476796993807.jpg\",\"width\":570,\"height\":380,\"caption\":\"CITRUP Portugal Ferrovial\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ferrovial Servi\u00e7os awarded the public contract for operation of the LIPOR II landfill\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Ferrovial Servi\u00e7os awarded the public contract for operation of the LIPOR II landfill Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/","og_locale":"en_US","og_type":"article","og_title":"Ferrovial Servi\u00e7os awarded the public contract for operation of the LIPOR II landfill Ferrovial","og_description":"Sala de prensa Ferrovial | \u00daltimas noticias","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-21T08:55:25+00:00","og_image":[{"width":570,"height":380,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2018\/07\/d9g_h182-citrup-previsualizacion-e1476796993807.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/","name":"Ferrovial Servi\u00e7os awarded the public contract for operation of the LIPOR II landfill Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151946\/d9g_h182-citrup-previsualizacion-e1476796993807.jpg","datePublished":"2016-10-21T00:00:00+00:00","dateModified":"2022-12-21T08:55:25+00:00","description":"Sala de prensa Ferrovial | \u00daltimas noticias","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151946\/d9g_h182-citrup-previsualizacion-e1476796993807.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151946\/d9g_h182-citrup-previsualizacion-e1476796993807.jpg","width":570,"height":380,"caption":"CITRUP Portugal Ferrovial"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-servicos-awarded-the-public-contract-for-operation-of-the-lipor-ii-landfill\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Ferrovial Servi\u00e7os awarded the public contract for operation of the LIPOR II landfill"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6168","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=6168"}],"version-history":[{"count":2,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6168\/revisions"}],"predecessor-version":[{"id":117395,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6168\/revisions\/117395"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/6169"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=6168"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=6168"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=6168"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=6168"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=6168"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=6168"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}