{"id":6340,"date":"2017-01-12T00:00:00","date_gmt":"2017-01-12T00:00:00","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/"},"modified":"2022-12-21T09:46:55","modified_gmt":"2022-12-21T08:46:55","slug":"cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/","title":{"rendered":"Cadagua to build a Pilot Plant for tests on the treatment of water from the Nervi\u00f3n River using BIM technology"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p><a title=\"Cadagua\" href=\"https:\/\/www.ferrovial.com\/en\/cadagua\/\" target=\"_blank\" rel=\"dofollow noopener\">Cadagua <\/a>has been selected by the <a title=\"Bilbao Bizkaia Water Consortium\" href=\"http:\/\/www.consorciodeaguas.com\/web\/inicio\/index.aspx\" target=\"_blank\" rel=\"dofollow noopener\">Bilbao Bizkaia Water Consortium (CABB)<\/a> to build a \u201cPILOT PLANT FOR TESTS ON THE TREATMENT OF WATER FROM THE NERVION RIVER IN BOLUETA\u201d. This is an ambitious project led by the Bilbao Bizkaia Water Consortium.<\/p>\n<p>By awarding this new project, the Consortium aims to:<\/p>\n<ul>\n<li>Identify potential future modifications to the drinking water treatment plant (ETAP) in Venta Alta as may be required to comply with the legislation in force when treating water from the Nervi\u00f3n River.<\/li>\n<li>Monitor operation of the plant under different scenarios of bulk water quality from the Nervi\u00f3n River, and under extreme conditions such as exceptional drought or heavy rains.<\/li>\n<li>Analyse plant capacity for eliminating any new pollutants that may emerge, in addition to the usual pollutants.<\/li>\n<\/ul>\n<p>Cadagua will develop an advanced and innovative 3D design using <a title=\"Ferrovial Blog- BIM (Building Information Modeling)\" href=\"https:\/\/www.ferrovial.com\/en-us\/innovation\/technologies\/bim\/\" target=\"_blank\" rel=\"dofollow noopener\">BIM (Building Information Modeling) <\/a>technology, enabling both the client and subcontractors to have total control over <strong>construction, and thus providing a guarantee as to completion period, flexibility, functionality and accessibility.<\/strong> With this end in mind, the plant will be prefabricated in its entirety, using a modular configuration which will be easy to transport and will take into account the limitations as to space and the strict requirements specified by the Consortium.<\/p>\n<p>This contract further strengthens Cadagua\u2019s expertise in the design, construction and advanced research in the field of water treatment plants. Involvement of Cadagua\u2019s R&amp;D department will be crucial for analysing potential future requirements of the <strong>Venta Alta Plant,<\/strong> with the Nervi\u00f3n River as an alternative water catchment source. Further advanced treatment tests will be carried out using ultra filtration membranes and oxidation processes. The plant will consist of 6 separate open modules, plus 4 closed modules housing reactants, control systems, a laboratory and offices.<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":6341,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1087,1152,1185],"nivel-5":[2157],"nivel-1":[896],"nivel-3":[1321],"nivel-4":[1820],"class_list":["post-6340","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-bim-en","nivel-2-innovation","nivel-2-water-treatment-plant","nivel-5-cadagua-en","nivel-1-construction","nivel-3-spain","nivel-4-basque-country"],"acf":[],"yoast_head":"<title>Cadagua to build a Pilot Plant for tests on the treatment of water from the Nervi\u00f3n River using BIM technology Ferrovial<\/title>\n<meta name=\"description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cadagua to build a Pilot Plant for tests on the treatment of water from the Nervi\u00f3n River using BIM technology Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-21T08:46:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2018\/07\/cadagua-pilot-plant.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"634\" \/>\n\t<meta property=\"og:image:height\" content=\"345\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\\\/\",\"url\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\\\/\",\"name\":\"Cadagua to build a Pilot Plant for tests on the treatment of water from the Nervi\u00f3n River using BIM technology Ferrovial\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2018\\\/07\\\/15151902\\\/cadagua-pilot-plant.jpg\",\"datePublished\":\"2017-01-12T00:00:00+00:00\",\"dateModified\":\"2022-12-21T08:46:55+00:00\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\\\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2018\\\/07\\\/15151902\\\/cadagua-pilot-plant.jpg\",\"contentUrl\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2018\\\/07\\\/15151902\\\/cadagua-pilot-plant.jpg\",\"width\":634,\"height\":345,\"caption\":\"Cadagua water plant\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cadagua to build a Pilot Plant for tests on the treatment of water from the Nervi\u00f3n River using BIM technology\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2018\\\/07\\\/15145720\\\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2018\\\/07\\\/15145720\\\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ferrovial\",\"https:\\\/\\\/x.com\\\/ferrovial\",\"https:\\\/\\\/www.instagram.com\\\/ferrovial\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/ferrovial\",\"https:\\\/\\\/www.pinterest.es\\\/ferrovial\\\/\",\"https:\\\/\\\/www.youtube.com\\\/ferrovial\",\"https:\\\/\\\/en.wikipedia.org\\\/wiki\\\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Cadagua to build a Pilot Plant for tests on the treatment of water from the Nervi\u00f3n River using BIM technology Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/","og_locale":"en_US","og_type":"article","og_title":"Cadagua to build a Pilot Plant for tests on the treatment of water from the Nervi\u00f3n River using BIM technology Ferrovial","og_description":"Sala de prensa Ferrovial | \u00daltimas noticias","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-21T08:46:55+00:00","og_image":[{"width":634,"height":345,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2018\/07\/cadagua-pilot-plant.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/","name":"Cadagua to build a Pilot Plant for tests on the treatment of water from the Nervi\u00f3n River using BIM technology Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151902\/cadagua-pilot-plant.jpg","datePublished":"2017-01-12T00:00:00+00:00","dateModified":"2022-12-21T08:46:55+00:00","description":"Sala de prensa Ferrovial | \u00daltimas noticias","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151902\/cadagua-pilot-plant.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151902\/cadagua-pilot-plant.jpg","width":634,"height":345,"caption":"Cadagua water plant"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/cadagua-to-build-a-pilot-plant-for-tests-on-the-treatment-of-water-from-the-nervion-river-using-bim-technology\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Cadagua to build a Pilot Plant for tests on the treatment of water from the Nervi\u00f3n River using BIM technology"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6340","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=6340"}],"version-history":[{"count":2,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6340\/revisions"}],"predecessor-version":[{"id":117284,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6340\/revisions\/117284"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/6341"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=6340"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=6340"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=6340"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=6340"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=6340"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=6340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}