{"id":6395,"date":"2017-02-09T00:00:00","date_gmt":"2017-02-09T00:00:00","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/"},"modified":"2022-12-21T09:43:27","modified_gmt":"2022-12-21T08:43:27","slug":"third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/","title":{"rendered":"Third lanes on the Ruta 5 Sur highway in Angostura (Chile) now open"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>Following three years of construction works, the third lane for the Angostura section of the <a title=\"Ruta 5 highway in Chile-Ferrovial\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/the-new-angostura-toll-plaza-on-chiles-pan-american-highway-comes-into-operation\/\" target=\"_blank\" rel=\"dofollow noopener\">Ruta 5 Sur highway <\/a>was opened on 25th January by Chile\u2019s <a title=\"Minister for Public Works in Chile-mop.cl\" href=\"http:\/\/www.mop.cl\/Paginas\/ingles.aspx\" target=\"_blank\" rel=\"dofollow noopener\">Minister for Public Works<\/a>, in the presence of Chile Director Joaqu\u00edn Torres and the site team.<\/p>\n<p>Construction works have involved an investment of <strong>90 million dollars<\/strong> for the provision of three lanes in each direction between kilometres 51 and 54 of the Ruta 5 Sur highway. This has allowed vehicle capacity to increase from <strong>2,800 to 5,000 vehicles per day.<\/strong><\/p>\n<p>This new stretch of highway which has now opened is 7\u00a0km long and connects the Metropolitan and O\u2019Higgins regions. It includes a new layout and two 10.5\u00a0m carriageways separated by a 3 metre median, flyovers, slope strengthening systems, drainage systems and security installations with closed circuit cameras and lighting. This road construction project is part of the extension and improvement of the Ruta 5 Sur highway in Chile, which includes the <strong>Nueva Angostura <\/strong>toll booth opened some months ago and duly covered in a news report. Construction has also involved the provision of a new connection for residents of the \u00c1guila Sur sector, a new return lane to the south of Angostura, and two new pedestrian bridges in <a title=\"San Francisco de Mostazal, Chile- Wikipedia\" href=\"https:\/\/simple.wikipedia.org\/wiki\/San_Francisco_de_Mostazal,_Chile\" target=\"_blank\" rel=\"nofollow noopener\">San Francisco Mostazal <\/a>and \u00c1guilaSur.<\/p>\n<p>The new stretch has required the excavation of 1,280,000\u00a0m<sup>3<\/sup> of rock and the cutting of 80 metre high banks with controlled explosions to remove 810,000\u00a0m<sup>3<\/sup> of earth. A total <strong>of 89,000\u00a0m<sup>3<\/sup> of aggregates<\/strong> and <strong>138,000\u00a0tonnes of asphalt<\/strong> have been used.<\/p>\n<p>The construction team led by Joaqu\u00edn Torres and Manager Javier Jim\u00e9nez was comprised by Seida Gonz\u00e1lez, Director for Quality and the Environment;\u00a0Samuel Cast\u00e1n, Site Manager;\u00a0Gema Santamarta, Head of Quality and the Environment; Raquel Rodr\u00edguez, Head of Technical Office; Javier Ponce, Adolfo Cestafe, Javier Merino and Jesus Castillo, Production Managers; El\u00edas Mancilla, Ariel Aedo, Diego PInto and Marcelo Cuevas, Safety and Prevention; Miguel Bintaned, Patricio Elizondo, Henri Garrido and H\u00e9ctor Soto, Managers; Pedro Medina, Alex S\u00e1nchez, Claudia Guerrero, Mart\u00edn Rivera, Joseba Iturriaga and Miguel Ulloa, Technical Office and Topography; Mauricio Boggen, Marta Mart\u00edn, Gabriel Villagran, Valentina Brieba and Francisco Espinoza, Administration.<\/p>\n<p>Find out more about Ferrovial&#8217;s work in Chile <a title=\"Ferrovial Blog- Health and safety work safety individual behaviours\" href=\"https:\/\/blog.ferrovial.com\/en\/2017\/01\/health-and-safety-work-safety-individual-behaviours\/\" target=\"_blank\" rel=\"dofollow noopener\">here<\/a><\/p>\n<p>&nbsp;<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":6396,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1149,1143,2092,1173,1191,1099,1169],"nivel-5":[],"nivel-1":[896,903],"nivel-3":[1319],"nivel-4":[],"class_list":["post-6395","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-infrastructures","nivel-2-openings","nivel-2-projects","nivel-2-public-works","nivel-2-road-network","nivel-2-roads","nivel-2-works","nivel-1-construction","nivel-1-highways","nivel-3-chile-en"],"acf":[],"yoast_head":"<title>Third lanes on the Ruta 5 Sur highway in Angostura (Chile) now open Ferrovial<\/title>\n<meta name=\"description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Third lanes on the Ruta 5 Sur highway in Angostura (Chile) now open Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-21T08:43:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2018\/07\/ruta-sur-5-chile-highway.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"4000\" \/>\n\t<meta property=\"og:image:height\" content=\"2250\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/\",\"name\":\"Third lanes on the Ruta 5 Sur highway in Angostura (Chile) now open Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151842\/ruta-sur-5-chile-highway.jpg\",\"datePublished\":\"2017-02-09T00:00:00+00:00\",\"dateModified\":\"2022-12-21T08:43:27+00:00\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151842\/ruta-sur-5-chile-highway.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151842\/ruta-sur-5-chile-highway.jpg\",\"width\":4000,\"height\":2250,\"caption\":\"The ruta sur 5 highway in Chile\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Third lanes on the Ruta 5 Sur highway in Angostura (Chile) now open\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Third lanes on the Ruta 5 Sur highway in Angostura (Chile) now open Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/","og_locale":"en_US","og_type":"article","og_title":"Third lanes on the Ruta 5 Sur highway in Angostura (Chile) now open Ferrovial","og_description":"Sala de prensa Ferrovial | \u00daltimas noticias","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-21T08:43:27+00:00","og_image":[{"width":4000,"height":2250,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2018\/07\/ruta-sur-5-chile-highway.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/","name":"Third lanes on the Ruta 5 Sur highway in Angostura (Chile) now open Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151842\/ruta-sur-5-chile-highway.jpg","datePublished":"2017-02-09T00:00:00+00:00","dateModified":"2022-12-21T08:43:27+00:00","description":"Sala de prensa Ferrovial | \u00daltimas noticias","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151842\/ruta-sur-5-chile-highway.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151842\/ruta-sur-5-chile-highway.jpg","width":4000,"height":2250,"caption":"The ruta sur 5 highway in Chile"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/third-lanes-on-the-ruta-5-sur-highway-in-angostura-chile-now-open\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Third lanes on the Ruta 5 Sur highway in Angostura (Chile) now open"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6395","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=6395"}],"version-history":[{"count":2,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6395\/revisions"}],"predecessor-version":[{"id":99012,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6395\/revisions\/99012"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/6396"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=6395"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=6395"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=6395"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=6395"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=6395"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=6395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}