{"id":6628,"date":"2017-06-05T00:00:00","date_gmt":"2017-06-05T00:00:00","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/news\/webber-selected-to-renovate-historic-hisd-high-school\/"},"modified":"2022-12-21T09:33:09","modified_gmt":"2022-12-21T08:33:09","slug":"webber-selected-to-renovate-historic-hisd-high-school","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/","title":{"rendered":"Webber Selected to Renovate Historic HISD High School"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p><a href=\"http:\/\/wwebber.com\/\"title=\"Webber\" target=\"_blank\" rel=\"nofollow\">Webber<\/a>, LLC has been selected by <a href=\"http:\/\/www.houstonisd.org\/\"title=\"Houston ISD\" target=\"_blank\" rel=\"dofollow\">Houston ISD<\/a> to renovate historic <a href=\"http:\/\/www.austinhighmaroons.org\/\"title=\"Stephen F. Austin High School\" target=\"_blank\" rel=\"dofollow\">Stephen F. Austin High School<\/a> in a two-phase project. Construction will include an extensive temporary building education complex along with the demolition and construction of the majority of the existing campus and interior <strong>renovations to original 1936 existing facility<\/strong>.<\/p>\n<p>The <a href=\"http:\/\/www.austinhighmaroons.org\/\"title=\"Stephen F. Austin High School\" target=\"_blank\" rel=\"nofollow\">Stephen F. Austin High School <\/a>renovation project is part of the 2012 HISD bond referendum for the construction of new schools, renovations, enhancements and other projects to meet the growth needs of the school district.<\/p>\n<p>Tim Creson, president &amp; CEO of Webber, LLC, said:<\/p>\n<blockquote><p>&#8220;We&#8217;re excited with the unique direction we&#8217;re taking to renovate a historical building&#8221;<\/p><\/blockquote>\n<p>He added:<\/p>\n<blockquote><p>&#8220;We pride ourselves on the construction of education spaces that encourage collaborative learning and the Commercial Division of Webber has a long history of building these solutions for many of the school districts across the greater Houston-area.&#8221;<\/p><\/blockquote>\n<p>Phase one of will begin in <strong>June 2017<\/strong>. There will be a total of <strong>11 portable buildings<\/strong>, which will include <strong>90+ classrooms<\/strong>, all administration offices, choir and a band space. A modular &#8220;multi-purpose&#8221; structure will also include an air-conditioned dining commons and will also be adaptable for PE activities. The CTE welding classes will be in a permanent pre-engineered structure due to the potential fire hazards and weights implications. Phase 1 will be completed in December 2017.<\/p>\n<p>Phase 2 will begin in <strong>December 2017<\/strong> and include the demolition of the interior of the old school while keeping the <strong>historic front fa\u00e7ade<\/strong> and <strong>renovating the original building built in 1936<\/strong>. In addition, it includes demolition of the rest of the campus buildings that have been added over the years and will be replaced with 184,000 square feet of new buildings. The new buildings will include the gyms, new classrooms, a library, band and music rooms and science labs. Classroom sizes will increase in size from the current 620-700 square feet to <strong>850 square feet<\/strong>. Science labs size will double. The exterior of the building will have new hardscaping, landscaping and outdoor learning spaces to give the school life into the 21st century. Phase 2 is set to complete in December of 2019.<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":6629,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1117,1111,1137,1149,2092,1196,1169],"nivel-5":[1712],"nivel-1":[896],"nivel-3":[1322],"nivel-4":[],"class_list":["post-6628","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-building","nivel-2-design-and-engineering","nivel-2-facilities","nivel-2-infrastructures","nivel-2-projects","nivel-2-rehabilitation-and-conservation","nivel-2-works","nivel-5-webber-en","nivel-1-construction","nivel-3-united-states"],"acf":[],"yoast_head":"<title>Webber Selected to Renovate Historic HISD High School Ferrovial<\/title>\n<meta name=\"description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Webber Selected to Renovate Historic HISD High School Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-21T08:33:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2018\/07\/renovate-historic-building-austin-high-school-houston.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"850\" \/>\n\t<meta property=\"og:image:height\" content=\"415\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/\",\"name\":\"Webber Selected to Renovate Historic HISD High School Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151703\/renovate-historic-building-austin-high-school-houston.jpg\",\"datePublished\":\"2017-06-05T00:00:00+00:00\",\"dateModified\":\"2022-12-21T08:33:09+00:00\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151703\/renovate-historic-building-austin-high-school-houston.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151703\/renovate-historic-building-austin-high-school-houston.jpg\",\"width\":850,\"height\":415,\"caption\":\"renovate historic building high school Houston Texas\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Webber Selected to Renovate Historic HISD High School\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Webber Selected to Renovate Historic HISD High School Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/","og_locale":"en_US","og_type":"article","og_title":"Webber Selected to Renovate Historic HISD High School Ferrovial","og_description":"Sala de prensa Ferrovial | \u00daltimas noticias","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-21T08:33:09+00:00","og_image":[{"width":850,"height":415,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2018\/07\/renovate-historic-building-austin-high-school-houston.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/","name":"Webber Selected to Renovate Historic HISD High School Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151703\/renovate-historic-building-austin-high-school-houston.jpg","datePublished":"2017-06-05T00:00:00+00:00","dateModified":"2022-12-21T08:33:09+00:00","description":"Sala de prensa Ferrovial | \u00daltimas noticias","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151703\/renovate-historic-building-austin-high-school-houston.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151703\/renovate-historic-building-austin-high-school-houston.jpg","width":850,"height":415,"caption":"renovate historic building high school Houston Texas"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/webber-selected-to-renovate-historic-hisd-high-school\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Webber Selected to Renovate Historic HISD High School"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6628","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=6628"}],"version-history":[{"count":1,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6628\/revisions"}],"predecessor-version":[{"id":101015,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6628\/revisions\/101015"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/6629"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=6628"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=6628"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=6628"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=6628"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=6628"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=6628"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}