{"id":6651,"date":"2017-06-14T00:00:00","date_gmt":"2017-06-14T00:00:00","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/"},"modified":"2024-10-28T23:38:48","modified_gmt":"2024-10-28T22:38:48","slug":"new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/","title":{"rendered":"New section of Polish S5 expressway open to traffic ahead of schedule"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>On 4th May 2017,\u00a0 an 18km\u2013long stretch of the\u00a0<a title=\"S5 Expressway - Ferrovial\" href=\"https:\/\/newsroom.ferrovial.com\/en\/press_releases\/ferrovial-s5-section-poland\/\" target=\"_blank\" rel=\"dofollow noopener\">S5 expressway <\/a>between the &#8220;Mieleszyn&#8221; and the &#8220;Gniezno Po\u0142udnie&#8221; junctions was opened,<strong> two months ahead of schedule.<\/strong> This newly constructed polish highway\u00a0will be able to transfer the transit traffic from Gniezno and will ultimately ensure a <strong>smooth link<\/strong> between the <strong>A1 Gdansk-Katowice motorway<\/strong> and<strong> A2 Pozna\u0144-Warszawa motorway.<\/strong><\/p>\n<p>Among those in attendance at the Polish highway opening was the vice Minister of Infrastructure and Voivode of Great Poland (Wielkopolska).<\/p>\n<p>The construction works have been carried out by the consortium of <a title=\"Budimex\" href=\"http:\/\/www.budimex.com.pl\/en\" target=\"_blank\" rel=\"dofollow noopener\">Budimex<\/a> and <a title=\"Ferrovial Agroman\" href=\"https:\/\/www.ferrovial.com\/en\/business-lines\/construction\/\" target=\"_blank\" rel=\"dofollow noopener\">Ferrovial Agroman <\/a>for <strong>PLN 500million,<\/strong> of which 85% was covered by the<a title=\"European Union\" href=\"http:\/\/europa.eu\/\" target=\"_blank\" rel=\"nofollow noopener\"> European Union <\/a>subsidy. Under the contract, Budimex has constructed three road junctions, Mieleszyn junction, Gniezno junction, K\u0142ecko junction), <strong>19 engineering facilities, 2 passenger service centres<\/strong>, <strong>transverse<\/strong> and access roads which have <strong>road lighting, barriers, drainage <\/strong>and<strong> drainage equipment.<\/strong> Furthermore, Budimex has completely changed and removed collisions of water and sewerage equipment, melioration equipment, power equipment, telecommunication, gas and railway equipment of multiple designs (overhead contact and power lines, telecommunications, tracks and others).<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":67,"featured_media":6652,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1150,1111,1143,2092,1191,1099,1169],"nivel-5":[],"nivel-1":[896],"nivel-3":[1882],"nivel-4":[],"class_list":["post-6651","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-civil-engineering","nivel-2-design-and-engineering","nivel-2-openings","nivel-2-projects","nivel-2-road-network","nivel-2-roads","nivel-2-works","nivel-1-construction","nivel-3-poland"],"acf":[],"yoast_head":"<title>New section of Polish S5 expressway open to traffic ahead of schedule Ferrovial<\/title>\n<meta name=\"description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New section of Polish S5 expressway open to traffic ahead of schedule Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-28T22:38:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2018\/07\/polish-highway-s5-expressway.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"850\" \/>\n\t<meta property=\"og:image:height\" content=\"415\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/\",\"name\":\"New section of Polish S5 expressway open to traffic ahead of schedule Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151658\/polish-highway-s5-expressway.jpg\",\"datePublished\":\"2017-06-14T00:00:00+00:00\",\"dateModified\":\"2024-10-28T22:38:48+00:00\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151658\/polish-highway-s5-expressway.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151658\/polish-highway-s5-expressway.jpg\",\"width\":850,\"height\":415,\"caption\":\"polish highway s5 expressway section open early\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New section of Polish S5 expressway open to traffic ahead of schedule\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"New section of Polish S5 expressway open to traffic ahead of schedule Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/","og_locale":"en_US","og_type":"article","og_title":"New section of Polish S5 expressway open to traffic ahead of schedule Ferrovial","og_description":"Sala de prensa Ferrovial | \u00daltimas noticias","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2024-10-28T22:38:48+00:00","og_image":[{"width":850,"height":415,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2018\/07\/polish-highway-s5-expressway.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/","name":"New section of Polish S5 expressway open to traffic ahead of schedule Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151658\/polish-highway-s5-expressway.jpg","datePublished":"2017-06-14T00:00:00+00:00","dateModified":"2024-10-28T22:38:48+00:00","description":"Sala de prensa Ferrovial | \u00daltimas noticias","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151658\/polish-highway-s5-expressway.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151658\/polish-highway-s5-expressway.jpg","width":850,"height":415,"caption":"polish highway s5 expressway section open early"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/new-section-of-polish-s5-expressway-open-to-traffic-ahead-of-schedule\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"New section of Polish S5 expressway open to traffic ahead of schedule"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6651","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"author":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/users\/67"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=6651"}],"version-history":[{"count":2,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6651\/revisions"}],"predecessor-version":[{"id":126369,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6651\/revisions\/126369"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/6652"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=6651"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=6651"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=6651"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=6651"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=6651"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=6651"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}