{"id":6792,"date":"2017-08-10T00:00:00","date_gmt":"2017-08-10T00:00:00","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/"},"modified":"2024-10-28T23:38:33","modified_gmt":"2024-10-28T22:38:33","slug":"ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/","title":{"rendered":"Ferrovial Agroman installs first girder beam for Fontanal Viaduct on the A23 motorway, Aragon"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>Ferrovial Agroman&#8217;s \u00a0machinery team have installed the first girder beam for the Fontanal Viaduct, a structure spanning<strong> 465 metres,<\/strong> with<strong> 11 spans and 10 pillars<\/strong>, as part of the <strong>Mud\u00e9jar A23 motorway<\/strong>, on the Caldearenas\u2013Lanave stretch. The project was awarded by the <a title=\"State Road Department\" href=\"https:\/\/www.carreterasaragon.com\/\" target=\"_blank\" rel=\"dofollow noopener\">State Road Department in Aragon <\/a>to <a title=\"Ferrovial Agroman\" href=\"https:\/\/www.ferrovial.com\/es\/lineas-de-negocio\/construccion\/\" target=\"_blank\" rel=\"dofollow noopener\">Ferrovial Agroman <\/a>and <a title=\"Compa\u00f1\u00eda de Obras Castillejos\" href=\"https:\/\/www.alimarket.es\/construccion\/empresa\/359834\/compania-de-obras-castillejos--s-a-\" target=\"_blank\" rel=\"dofollow noopener\">Compa\u00f1\u00eda de Obras Castillejos<\/a> in 2008, as a contract worth over 58 million euros.<\/p>\n<p>Fontanal is the longest viaduct of the three envisaged within the project. It is a <strong>curved structure<\/strong> on the uphill stretch towards Huesca. It has a <strong>270-metre radius,<\/strong> a <strong>longitudinal gradient of 6.16%<\/strong> and a <strong>cross-sectional camber of 8%.<\/strong><\/p>\n<p>The deck is <strong>13.54 metres<\/strong> wide with 11 spans resting on pre-cast reinforced concrete girders of double T section,\u00a0<strong>2.40 metres in flange<\/strong> width and a maximum weight of 70 tonnes. Each span has a length of<strong> 42.60 metres<\/strong> to the axis of the deck and is formed by five girders connected by a 25-cm thick \u201cin situ\u201d concrete slab on which it rests.<\/p>\n<p>In May, the specialist team launched the first girder, using a <strong>110-tonne launching truss gantry<\/strong> owned by Ferrovial Agroman. To deliver the girders and load and feed the launching gantry, a pair of portico girders were used to move the girders and preslabs along the structure. The launching team is currently working on the seventh span.<\/p>\n<h2><strong>Caldearenas &#8211; Lanave stretch of the A23 motorway<\/strong><\/h2>\n<p>The Mud\u00e9jar A23 motorway, on the Caldearenas \u2013 Lanave stretch in Huesca, runs South to North along the <strong>N-330 road corridor<\/strong> from Alicante to France via Zaragoza, in the provinces of Zaragoza and Huesca.<\/p>\n<p>The most notable structures of this stretch of motorway, which is almost 15 km long, are the<strong> 395-metre tunnel<\/strong>, equipped with <strong>medium and low voltage electrical installations<\/strong>, <strong>fire protection, lighting and safety controls<\/strong>; the Fontana viaduct, an isostatic viaduct made with 465-metre precast concrete curved girders with a radius of 270 metres; the Guarga viaduct, a mixed structure of 350 metres and two parallel isostatic viaducts; and the Lanave link which will join the Caldearenas \u2013 Lanave stretch through a roundabout elevated over the motorway to the N-330 which continues the route to the north. Additionally, the construction of 3 overpasses are worthy of note: 0.1, where the Caldearenas link crosses over the motorway on an isostatic deck made of double T precast concrete girders, with three spans; 1.2, which allows crossing of the main carriageways using a prestressed concrete slab with a 1 metre side; and 3.6 which provides access to the centre of Belarra from the current N-330 through a mixed, single-span bi-integrated structure.<\/p>\n<p>Also worthy of note are the<strong> four animal crossings,<\/strong> designed to<strong> ensure permeability of the route<\/strong> and essentially allowing the crossing of large land mammals living in the area, such as wild boar, roe and red deer. The transversal drainage systems will be adapted to facilitate the crossing of small species, such as rabbits and European hare. Other environmental activities are envisaged, such as planting and provision of native tree species to ensure environmental integration and restoration of the area around the Guarga River. This will guarantee habitat conservation for <strong>5 species of amphibian, 4 species of reptiles, 76 birds and 24 mammals<\/strong> detected in the area.<\/p>\n<p>Moreover, the project includes the provision of a series of <strong>optic fibre communication networks<\/strong> to feed information on the state of the road and traffic incidences through weather stations, video-surveillance points and de-icing systems; and the expansion of the electrical substation of Monrep\u00f3s to supply adequate electricity demand within the tunnels.<\/p>\n<p><iframe loading=\"lazy\" src=\"https:\/\/www.youtube-nocookie.com\/embed\/8ACZ_Co9nvY\" width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":6793,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1150,1111,1082,1149,2092,1169],"nivel-5":[2148],"nivel-1":[896],"nivel-3":[1321],"nivel-4":[1782],"class_list":["post-6792","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-civil-engineering","nivel-2-design-and-engineering","nivel-2-expressways","nivel-2-infrastructures","nivel-2-projects","nivel-2-works","nivel-5-ferrovial-construction","nivel-1-construction","nivel-3-spain","nivel-4-aragon-en"],"acf":[],"yoast_head":"<title>Ferrovial Agroman installs first girder beam for Fontanal Viaduct on the A23 motorway, Aragon Ferrovial<\/title>\n<meta name=\"description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ferrovial Agroman installs first girder beam for Fontanal Viaduct on the A23 motorway, Aragon Ferrovial\" \/>\n<meta property=\"og:description\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-28T22:38:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2018\/07\/a23-motorway-aragon-spain-e1502192380406.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1125\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\\\/\",\"url\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\\\/\",\"name\":\"Ferrovial Agroman installs first girder beam for Fontanal Viaduct on the A23 motorway, Aragon Ferrovial\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2018\\\/07\\\/15151606\\\/a23-motorway-aragon-spain-e1502192380406.jpg\",\"datePublished\":\"2017-08-10T00:00:00+00:00\",\"dateModified\":\"2024-10-28T22:38:33+00:00\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\\\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2018\\\/07\\\/15151606\\\/a23-motorway-aragon-spain-e1502192380406.jpg\",\"contentUrl\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2018\\\/07\\\/15151606\\\/a23-motorway-aragon-spain-e1502192380406.jpg\",\"width\":2000,\"height\":1125,\"caption\":\"a23 motorway aragon spain\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/news\\\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ferrovial Agroman installs first girder beam for Fontanal Viaduct on the A23 motorway, Aragon\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2018\\\/07\\\/15145720\\\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\\\/\\\/static.newsroom.ferrovial.com\\\/wp-content\\\/uploads\\\/2018\\\/07\\\/15145720\\\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\\\/\\\/newsroom.ferrovial.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ferrovial\",\"https:\\\/\\\/x.com\\\/ferrovial\",\"https:\\\/\\\/www.instagram.com\\\/ferrovial\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/ferrovial\",\"https:\\\/\\\/www.pinterest.es\\\/ferrovial\\\/\",\"https:\\\/\\\/www.youtube.com\\\/ferrovial\",\"https:\\\/\\\/en.wikipedia.org\\\/wiki\\\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Ferrovial Agroman installs first girder beam for Fontanal Viaduct on the A23 motorway, Aragon Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/","og_locale":"en_US","og_type":"article","og_title":"Ferrovial Agroman installs first girder beam for Fontanal Viaduct on the A23 motorway, Aragon Ferrovial","og_description":"Sala de prensa Ferrovial | \u00daltimas noticias","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2024-10-28T22:38:33+00:00","og_image":[{"width":2000,"height":1125,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2018\/07\/a23-motorway-aragon-spain-e1502192380406.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/","name":"Ferrovial Agroman installs first girder beam for Fontanal Viaduct on the A23 motorway, Aragon Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151606\/a23-motorway-aragon-spain-e1502192380406.jpg","datePublished":"2017-08-10T00:00:00+00:00","dateModified":"2024-10-28T22:38:33+00:00","description":"Sala de prensa Ferrovial | \u00daltimas noticias","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151606\/a23-motorway-aragon-spain-e1502192380406.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15151606\/a23-motorway-aragon-spain-e1502192380406.jpg","width":2000,"height":1125,"caption":"a23 motorway aragon spain"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-installs-first-girder-beam-for-fontanal-viaduct-on-the-a23-motorway-aragon\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Ferrovial Agroman installs first girder beam for Fontanal Viaduct on the A23 motorway, Aragon"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6792","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=6792"}],"version-history":[{"count":2,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6792\/revisions"}],"predecessor-version":[{"id":126367,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/6792\/revisions\/126367"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/6793"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=6792"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=6792"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=6792"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=6792"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=6792"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=6792"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}