{"id":81307,"date":"2019-03-20T09:07:41","date_gmt":"2019-03-20T08:07:41","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=new&#038;p=81307"},"modified":"2024-11-04T18:39:22","modified_gmt":"2024-11-04T17:39:22","slug":"connection-oroteanda-chafiras-tenerife","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/","title":{"rendered":"Ferrovial Agroman Is Working on the Connection Between Oroteanda and Las Chafiras, Tenerife"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>This new section, approximately <strong>two kilometers long<\/strong> &#8211; which more than 50,000 vehicles currently travel on each day &#8211; will alleviate the <strong>highway&#8217;s congestion<\/strong> and give the stretch of roadway <strong>higher capacity<\/strong>, since it passes by urban centers.<\/p>\n<p>Among those present at the event were: regional executive president, Fernando Clavijo, Public Works chairman, Pablo Rodr\u00edguez, as well as the president of Tenerife&#8217;s Cabildo, Carlos Alonso, mayor of San Miguel de Abona, Arturo Gonz\u00e1lez, and technicians from the Canary Island government. They all expressed their satisfaction with progress on the project.<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"image-section \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n        <figure class=\"image-section__figure\">\n            <img decoding=\"async\" src=\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/03\/15152223\/equipo-obra.jpg\" title=\"construction team Connection Between Oroteanda and Las Chafiras\" alt=\"construction team Connection Between Oroteanda and Las Chafiras\" class=\"image-section__image\">\n                    <\/figure>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                More projects will follow, such as the closing of the Anillo Insular, improvements on the Norte highway, and expansion of the Autopista del Sur.            <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\">Carlos Alonso <\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                        President of Tenerife&#039;s Cabildo                    <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n    <section class=\"image-section \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n        <figure class=\"image-section__figure\">\n            <img decoding=\"async\" src=\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/03\/15152222\/las-chafiras-obras-1200x627.jpg\" title=\"The President Mr. Fernando Clavijo Batlle las chafiras, Oroteanda\" alt=\"The President Mr. Fernando Clavijo Batlle las chafiras, Oroteanda\" class=\"image-section__image\">\n                    <\/figure>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                It&#039;s a \u20ac23 million project that is rather complex. Ferrovial Agroman and its partners will have to build two new exit ramps, drainage work, service roads, and expand the highway platform, all while keeping up with intense traffic. The start of construction experienced a slight setback when a colony of Pimelia tinerfe\u00f1a, a beetle native to the island, was found, but it was worked out by moving them to another location, and construction is continuing at a good pace.            <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\">Ricardo P\u00e9rez Queipo<\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                        Director of Construction for Z1                    <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n    <section class=\"image-section \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n        <figure class=\"image-section__figure\">\n            <img decoding=\"async\" src=\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/03\/15152221\/oroteanda-enlace-poster.jpg\" title=\"Connection Between Oroteanda and Las Chafiras, Tenerife\" alt=\"Connection Between Oroteanda and Las Chafiras, Tenerife\" class=\"image-section__image\">\n                    <\/figure>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <h2>What construction on the Oroteanda &#8211; Las Chafiras stretch entails<\/h2>\n<p>The Oroteanda &#8211; Las Chafiras link project consists of two phases: the first, which is currently underway on the left shoulder of Barranco de Archile, aims to improve the Oroteanda link. The second phase is on the Las Chafiras intersection.<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"image-section \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n        <figure class=\"image-section__figure\">\n            <img decoding=\"async\" src=\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/03\/15152222\/oroteanda-enlace.jpg\" title=\"What construction on the Oroteanda - Las Chafiras stretch entails  The Oroteanda - Las Chafiras link project consists of two phases: the first, which is currently underway on the left shoulder of Barranco de Archile, aims to improve the Oroteanda link. The second phase is on the Las Chafiras intersection presentation\" alt=\"What construction on the Oroteanda - Las Chafiras stretch entails The Oroteanda - Las Chafiras link project consists of two phases: the first, which is currently underway on the left shoulder of Barranco de Archile, aims to improve the Oroteanda link. The second phase is on the Las Chafiras intersection presentation\" class=\"image-section__image\">\n                    <\/figure>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>The complexity of this project centers on inserting the planned structures in an area with a high density of affected services while managing traffic. Among the updates involved, the execution of transversal drainage work 19 meters wide and 250 meters long under the highway is especially notable. We have the support of Ferrovial Agroman&#8217;s Technical Direction, which is fundamental in construction work of this sort.<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1005273,"featured_media":81302,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1150,2529,1149,2092,1169],"nivel-5":[2148],"nivel-1":[896],"nivel-3":[1321],"nivel-4":[1806],"class_list":["post-81307","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-civil-engineering","nivel-2-civil-works-en","nivel-2-infrastructures","nivel-2-projects","nivel-2-works","nivel-5-ferrovial-construction","nivel-1-construction","nivel-3-spain","nivel-4-canary-islands"],"acf":[],"yoast_head":"<title>Connection Between Oroteanda and Las Chafiras, Tenerife<\/title>\n<meta name=\"description\" content=\"Agroman has visited the construction site on the island of Tenerife where they will build a new two-kilometer stretch of highway.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Connection Between Oroteanda and Las Chafiras, Tenerife\" \/>\n<meta property=\"og:description\" content=\"Agroman has visited the construction site on the island of Tenerife where they will build a new two-kilometer stretch of highway.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-04T17:39:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2019\/03\/visita-clavijo-obras-oroteanda-4_g.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"533\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/\",\"name\":\"Connection Between Oroteanda and Las Chafiras, Tenerife\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/03\/15152220\/visita-clavijo-obras-oroteanda-4_g.jpg\",\"datePublished\":\"2019-03-20T08:07:41+00:00\",\"dateModified\":\"2024-11-04T17:39:22+00:00\",\"description\":\"Agroman has visited the construction site on the island of Tenerife where they will build a new two-kilometer stretch of highway.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/03\/15152220\/visita-clavijo-obras-oroteanda-4_g.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/03\/15152220\/visita-clavijo-obras-oroteanda-4_g.jpg\",\"width\":800,\"height\":533,\"caption\":\"Ferrovial Agroman Is Working on the Connection Between Oroteanda and Las Chafiras, Tenerife\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ferrovial Agroman Is Working on the Connection Between Oroteanda and Las Chafiras, Tenerife\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Connection Between Oroteanda and Las Chafiras, Tenerife","description":"Agroman has visited the construction site on the island of Tenerife where they will build a new two-kilometer stretch of highway.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/","og_locale":"en_US","og_type":"article","og_title":"Connection Between Oroteanda and Las Chafiras, Tenerife","og_description":"Agroman has visited the construction site on the island of Tenerife where they will build a new two-kilometer stretch of highway.","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2024-11-04T17:39:22+00:00","og_image":[{"width":800,"height":533,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2019\/03\/visita-clavijo-obras-oroteanda-4_g.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/","name":"Connection Between Oroteanda and Las Chafiras, Tenerife","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/03\/15152220\/visita-clavijo-obras-oroteanda-4_g.jpg","datePublished":"2019-03-20T08:07:41+00:00","dateModified":"2024-11-04T17:39:22+00:00","description":"Agroman has visited the construction site on the island of Tenerife where they will build a new two-kilometer stretch of highway.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/03\/15152220\/visita-clavijo-obras-oroteanda-4_g.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/03\/15152220\/visita-clavijo-obras-oroteanda-4_g.jpg","width":800,"height":533,"caption":"Ferrovial Agroman Is Working on the Connection Between Oroteanda and Las Chafiras, Tenerife"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/connection-oroteanda-chafiras-tenerife\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Ferrovial Agroman Is Working on the Connection Between Oroteanda and Las Chafiras, Tenerife"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/81307","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"author":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/users\/1005273"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=81307"}],"version-history":[{"count":2,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/81307\/revisions"}],"predecessor-version":[{"id":126351,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/81307\/revisions\/126351"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/81302"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=81307"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=81307"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=81307"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=81307"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=81307"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=81307"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}