{"id":88866,"date":"2019-07-03T10:18:39","date_gmt":"2019-07-03T08:18:39","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=new&#038;p=88866"},"modified":"2022-12-21T08:59:54","modified_gmt":"2022-12-21T07:59:54","slug":"ferrovial-agroman-chosen-for-subterranean-railway-murcia","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/","title":{"rendered":"Ferrovial Agroman Chosen for Subterranean Construction Work on the Station at Murcia El Carmen, Barriomar, and Nonduermas"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>This would make it compatible with other types of transportation, as well as the construction of a <strong>new<\/strong> <strong>station<\/strong> that will service the new tracks. The project budget awarded to Ferrovial Agroman and Acciona Infraestructuras amounts to \u20ac158.8 million, and the period for completion is 36 months.<\/p>\n<h2><strong>Underground construction on Nonduermas<\/strong><\/h2>\n<p>The projected layout, which will be completed over a period of <strong>27 months<\/strong>, has a length of <strong>2,503 m<\/strong>, with a platform for a<strong> two-way, high-speed track<\/strong><strong>.<\/strong> The layout is divided into <strong>5<\/strong> <strong>sections<\/strong> and includes setting up two tracks, one of UIC width and the other of varying width.<\/p>\n<h2><strong>Underground construction on the station at El Carmen and Barriomar<\/strong><\/h2>\n<p>Work on the station at El Carmen and Barriomar involves the construction of a <strong>2,830 m<\/strong> section underground, from the los Miajas track in the Nonduermas-Barriomar area to the connection with construction currently underway around Santiago El Mayor and Senda de los Garres, with a completion period of <strong>36 months.<\/strong><\/p>\n<p>The project includes building a new station located on the concrete cover for the cut and cover tunnel that will house the underground tracks for Medium and Long Distance Cercan\u00edas trains. The projected building, which covers an area of about <strong>4,400 m2,<\/strong> will replace the current one, which will be used for different purposes at the same site.<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"image-section \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n        <figure class=\"image-section__figure\">\n            <img decoding=\"async\" src=\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/07\/15144949\/modelo-estacion-e1562140989695.jpg\" title=\"Model of a railway station\" alt=\"Image of a railway station project\" class=\"image-section__image\">\n                    <\/figure>\n        <\/div>\n    <\/section>\n    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>The entire section from the start to the station consists of a double track, one of mixed width and one of standard width, while up to <strong>7 tracks<\/strong>, <strong>4 of<\/strong> <strong>standard width<\/strong> and <strong>3 of<\/strong> <strong>varying width,<\/strong> have been planned around the station.<\/p>\n<p>The project also provides for building emergency exits at most every 1,000 meters along the underground section, while at the station they will be located every 100 m, as well as the set-up slab tracks by installing 60 kg\/m rail, multipurpose sleepers, and 19 track devices.<\/p>\n<h2><strong>Using the BIM methodology<\/strong><\/h2>\n<p>Due to the complexity and uniqueness of construction, <a href=\"https:\/\/blog.ferrovial.com\/en\/tag\/bim-en-2\/\" target=\"_blank\" rel=\"noopener\"><strong>BIM methodology<\/strong><\/a> was used during the bidding process for detailed analysis of <strong>project<\/strong> <strong>milestones, <\/strong>including both construction processes as well phases when project development should take place. In addition, Ferrovial Agroman proposed continued use of this methodology throughout the construction phase in the bidding documents. This proposal was successfully secured by the contracting authority \u2013 ADIF \u2013 which was reflected in the excellent technical assessment obtained.<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":88863,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1087,1101,1111,2092,1192,1176,1131],"nivel-5":[2148],"nivel-1":[896],"nivel-3":[1321],"nivel-4":[1814],"class_list":["post-88866","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-bim-en","nivel-2-contracts","nivel-2-design-and-engineering","nivel-2-projects","nivel-2-rail-network","nivel-2-rail-operations","nivel-2-train-station","nivel-5-ferrovial-construction","nivel-1-construction","nivel-3-spain","nivel-4-murcia-en"],"acf":[],"yoast_head":"<title>Ferrovial Agroman Chosen for Subterranean Construction Work at Murcia<\/title>\n<meta name=\"description\" content=\"The contract is comprised of underground construction work for Nonduermas and for the station at El Carmen and Barriomar.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ferrovial Agroman Chosen for Subterranean Construction Work at Murcia\" \/>\n<meta property=\"og:description\" content=\"The contract is comprised of underground construction work for Nonduermas and for the station at El Carmen and Barriomar.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-21T07:59:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2019\/07\/vista-aerea-modelo-2-e1562140823234.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"393\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/\",\"name\":\"Ferrovial Agroman Chosen for Subterranean Construction Work at Murcia\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/07\/15144947\/vista-aerea-modelo-2-e1562140823234.jpg\",\"datePublished\":\"2019-07-03T08:18:39+00:00\",\"dateModified\":\"2022-12-21T07:59:54+00:00\",\"description\":\"The contract is comprised of underground construction work for Nonduermas and for the station at El Carmen and Barriomar.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/07\/15144947\/vista-aerea-modelo-2-e1562140823234.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/07\/15144947\/vista-aerea-modelo-2-e1562140823234.jpg\",\"width\":1200,\"height\":393,\"caption\":\"Image of train tracks and railway station\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ferrovial Agroman Chosen for Subterranean Construction Work on the Station at Murcia El Carmen, Barriomar, and Nonduermas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Ferrovial Agroman Chosen for Subterranean Construction Work at Murcia","description":"The contract is comprised of underground construction work for Nonduermas and for the station at El Carmen and Barriomar.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/","og_locale":"en_US","og_type":"article","og_title":"Ferrovial Agroman Chosen for Subterranean Construction Work at Murcia","og_description":"The contract is comprised of underground construction work for Nonduermas and for the station at El Carmen and Barriomar.","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-21T07:59:54+00:00","og_image":[{"width":1200,"height":393,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2019\/07\/vista-aerea-modelo-2-e1562140823234.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/","name":"Ferrovial Agroman Chosen for Subterranean Construction Work at Murcia","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/07\/15144947\/vista-aerea-modelo-2-e1562140823234.jpg","datePublished":"2019-07-03T08:18:39+00:00","dateModified":"2022-12-21T07:59:54+00:00","description":"The contract is comprised of underground construction work for Nonduermas and for the station at El Carmen and Barriomar.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/07\/15144947\/vista-aerea-modelo-2-e1562140823234.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/07\/15144947\/vista-aerea-modelo-2-e1562140823234.jpg","width":1200,"height":393,"caption":"Image of train tracks and railway station"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-agroman-chosen-for-subterranean-railway-murcia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Ferrovial Agroman Chosen for Subterranean Construction Work on the Station at Murcia El Carmen, Barriomar, and Nonduermas"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/88866","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=88866"}],"version-history":[{"count":1,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/88866\/revisions"}],"predecessor-version":[{"id":100906,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/88866\/revisions\/100906"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/88863"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=88866"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=88866"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=88866"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=88866"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=88866"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=88866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}