{"id":90135,"date":"2019-09-20T09:32:39","date_gmt":"2019-09-20T07:32:39","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=new&#038;p=90135"},"modified":"2024-10-28T23:22:18","modified_gmt":"2024-10-28T22:22:18","slug":"tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/","title":{"rendered":"Tideway\u00b4s tunnel drive site at Kirtling Street receives its 100th Segment Barge"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>So far, over 25,000 of the concrete segments have been delivered to the site, removing the need for over 6,000 heavy good vehicle movements on the road. Eight segments are used to make one full ring, with each segment weighing around 4 tons. The segments are stored on site before being lowered into the site\u2019s shaft and transported to one of the two tunnel boring machines currently driving from Kirtling Street. All of the concrete segments used for the tunnel are being delivered by river transport as part of the <strong>project\u00b4s commitment to utilize the river when possible<\/strong>.<\/p>\n<p>The <a href=\"https:\/\/www.tideway.london\/\" target=\"_blank\" rel=\"noopener\">Thames Tideway tunnel<\/a>, which is divided into three main sections and has a total length of 25 kms, is the newest infrastructure under construction to <strong>improve London\u2019s sewer system<\/strong>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-90138\" src=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2019\/09\/tideway-1-480x466.jpg\" alt=\" image of the interior of the Tideway tunnel\" width=\"699\" height=\"466\" srcset=\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/09\/15144707\/tideway-1-300x200.jpg 300w, https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2019\/09\/15144707\/tideway-1.jpg 699w\" sizes=\"auto, (max-width: 699px) 100vw, 699px\" \/><\/p>\n<p>Ferrovial Agroman is part of a Joint Venture building the 12.7 km long central section, as well as building 8 shafts between 42 and 62 metres deep, 6 tunnels connecting with the main tunnel, and <strong>landscaping the architectural integration<\/strong> on the banks of the river.<\/p>\n<p>In this video we show you the main features behind the Thames Tideway Tunnel project.<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1005273,"featured_media":90124,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1150,1172,1486,1220,1148],"nivel-5":[2148],"nivel-1":[896],"nivel-3":[1327],"nivel-4":[],"class_list":["post-90135","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-civil-engineering","nivel-2-hydraulic-works","nivel-2-sustainability","nivel-2-tunnels","nivel-2-urban-infrastructure","nivel-5-ferrovial-construction","nivel-1-construction","nivel-3-uk"],"acf":[],"yoast_head":"<title>Tideway\u00b4s tunnel drive site receives its 100th Segment Barge<\/title>\n<meta name=\"description\" content=\"The Thames Tideway tunnel, which has a total length of 25 kms, is the newest infrastructure under construction to improve London\u2019s sewer system.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tideway\u00b4s tunnel drive site receives its 100th Segment Barge\" \/>\n<meta property=\"og:description\" content=\"The Thames Tideway tunnel, which has a total length of 25 kms, is the newest infrastructure under construction to improve London\u2019s sewer system.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-28T22:22:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2019\/09\/tideway-ii-e1568963028225.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"498\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/\",\"name\":\"Tideway\u00b4s tunnel drive site receives its 100th Segment Barge\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/2019\/09\/tideway-ii-e1568963028225.jpg\",\"datePublished\":\"2019-09-20T07:32:39+00:00\",\"dateModified\":\"2024-10-28T22:22:18+00:00\",\"description\":\"The Thames Tideway tunnel, which has a total length of 25 kms, is the newest infrastructure under construction to improve London\u2019s sewer system.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/#primaryimage\",\"url\":\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/2019\/09\/tideway-ii-e1568963028225.jpg\",\"contentUrl\":\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/2019\/09\/tideway-ii-e1568963028225.jpg\",\"width\":1200,\"height\":498},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tideway\u00b4s tunnel drive site at Kirtling Street receives its 100th Segment Barge\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Tideway\u00b4s tunnel drive site receives its 100th Segment Barge","description":"The Thames Tideway tunnel, which has a total length of 25 kms, is the newest infrastructure under construction to improve London\u2019s sewer system.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/","og_locale":"en_US","og_type":"article","og_title":"Tideway\u00b4s tunnel drive site receives its 100th Segment Barge","og_description":"The Thames Tideway tunnel, which has a total length of 25 kms, is the newest infrastructure under construction to improve London\u2019s sewer system.","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2024-10-28T22:22:18+00:00","og_image":[{"width":1200,"height":498,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2019\/09\/tideway-ii-e1568963028225.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/","name":"Tideway\u00b4s tunnel drive site receives its 100th Segment Barge","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/#primaryimage"},"thumbnailUrl":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/2019\/09\/tideway-ii-e1568963028225.jpg","datePublished":"2019-09-20T07:32:39+00:00","dateModified":"2024-10-28T22:22:18+00:00","description":"The Thames Tideway tunnel, which has a total length of 25 kms, is the newest infrastructure under construction to improve London\u2019s sewer system.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/#primaryimage","url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/2019\/09\/tideway-ii-e1568963028225.jpg","contentUrl":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/2019\/09\/tideway-ii-e1568963028225.jpg","width":1200,"height":498},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/tideways-tunnel-drive-site-at-kirtling-street-receives-its-100th-segment-barge\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Tideway\u00b4s tunnel drive site at Kirtling Street receives its 100th Segment Barge"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/90135","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"author":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/users\/1005273"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=90135"}],"version-history":[{"count":2,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/90135\/revisions"}],"predecessor-version":[{"id":126343,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/90135\/revisions\/126343"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/90124"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=90135"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=90135"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=90135"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=90135"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=90135"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=90135"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}