{"id":93985,"date":"2020-01-17T13:16:14","date_gmt":"2020-01-17T12:16:14","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=new&#038;p=93985"},"modified":"2022-12-21T08:52:32","modified_gmt":"2022-12-21T07:52:32","slug":"pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/","title":{"rendered":"Pearland Water Reclamation Facility Project recognized as one of the ENR\u2019 Best Projects of 2019"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>This PLW Waterworks project was critical to the City of Pearland, as it was faced with limited capacity due to its exponential growth and aging infrastructure. The project consisted of <strong>wastewater treatment expansion <\/strong>from two million gallons per day (MGD) to six million, that commenced on the heels of an Emergency Package Plant Expansion just one year prior.<\/p>\n<p>The PLW team performed structural and process mechanical modifications to an existing Lift Station with new pumps and baffles, structural upgrades of existing Sequence Batch Reactor (SBR) Basins with all new process equipment including diffusers, air piping and valves and a new basin structure to increase capacity. They also installed numerous equipment and piping and worked on civil modifications, architectural and building construction elements and demolition of existing facilities.<\/p>\n<p>The project\u2019s main challenges included an aggressive milestone sequence and duration, American Iron and Steel (AIS) requirements, maintaining existing plant operations during construction and withstanding Hurricane Harvey. Despite the aggressive milestones, each portion of the project was delivered ahead of schedule. The team resolved this challenge by establishing a \u201cproject-first\u201d culture between all stakeholders. A great example of teamwork was the coordinated efforts to ensure maintenance of plant operations during construction.<\/p>\n<p>During the peak of construction, PLW and the City worked together to protect the jobsite from Hurricane Harvey. Despite catastrophic flooding in Pearland, the project suffered minimal impact. Whether countless hours of pumping water and sandbagging to protect the equipment and plant itself, this teamwork ensured uninterrupted operations to serve the community.<\/p>\n<p>The Pearland project was also very innovative because it was awarded via <strong>Competitive Sealed Proposal (CSP)<\/strong>, which is a values-based selection where Owners choose a Contractor based upon a published set of metrics with regards to price and technical capability. This project also included numerous process equipment solicitations that were pre-negotiated, and therefore saved the City time and money with regards to its completion.<\/p>\n        <\/div>\n    <\/section>\n    <section class=\"block-quote \" id=\"\">\n        <div class=\"container container--narrow container--p-10 block-quote__body\">\n            <blockquote class=\"block-quote__text\" aria-label=\"\">\n                \u201cThis project was instrumental to winning additional work with the City of Pearland recently. Building relationships and running the project, the Webber Way gave us the opportunity to bid and win more work with one of the fastest growing communities in Texas. This award is another feather in the team\u2019s cap for a job well done.\u201d            <\/blockquote>\n\n            <footer class=\"block-quote__footer\">\n                                    <p class=\"block-quote__author\" aria-label=\"\">\n                        <span class=\"block-quote__author-name\">Emilio Lopez<\/span>\n                    <\/p>\n                                    <p class=\"block-quote__author-role\" aria-label=\"\">\n                        President of the Waterworks division                    <\/p>\n                            <\/footer>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":93982,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1071,1073,1072,1185],"nivel-5":[1712],"nivel-1":[896],"nivel-3":[1322],"nivel-4":[1822],"class_list":["post-93985","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-awards","nivel-2-waste-water","nivel-2-water","nivel-2-water-treatment-plant","nivel-5-webber-en","nivel-1-construction","nivel-3-united-states","nivel-4-texas-en"],"acf":[],"yoast_head":"<title>Pearland Water Reclamation Facility Project<\/title>\n<meta name=\"description\" content=\"The project, carried out by PLW and Webber, two subsidiaries of Ferrovial, wins ENR Best Project Award 2019.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pearland Water Reclamation Facility Project\" \/>\n<meta property=\"og:description\" content=\"The project, carried out by PLW and Webber, two subsidiaries of Ferrovial, wins ENR Best Project Award 2019.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-21T07:52:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2020\/01\/pearland-reflection-bay-water-reclamation.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"899\" \/>\n\t<meta property=\"og:image:height\" content=\"550\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/\",\"name\":\"Pearland Water Reclamation Facility Project\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/01\/15143949\/pearland-reflection-bay-water-reclamation.jpg\",\"datePublished\":\"2020-01-17T12:16:14+00:00\",\"dateModified\":\"2022-12-21T07:52:32+00:00\",\"description\":\"The project, carried out by PLW and Webber, two subsidiaries of Ferrovial, wins ENR Best Project Award 2019.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/01\/15143949\/pearland-reflection-bay-water-reclamation.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/01\/15143949\/pearland-reflection-bay-water-reclamation.jpg\",\"width\":899,\"height\":550,\"caption\":\"Pearland reflection bay watereclamation\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pearland Water Reclamation Facility Project recognized as one of the ENR\u2019 Best Projects of 2019\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Pearland Water Reclamation Facility Project","description":"The project, carried out by PLW and Webber, two subsidiaries of Ferrovial, wins ENR Best Project Award 2019.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/","og_locale":"en_US","og_type":"article","og_title":"Pearland Water Reclamation Facility Project","og_description":"The project, carried out by PLW and Webber, two subsidiaries of Ferrovial, wins ENR Best Project Award 2019.","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-21T07:52:32+00:00","og_image":[{"width":899,"height":550,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2020\/01\/pearland-reflection-bay-water-reclamation.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/","name":"Pearland Water Reclamation Facility Project","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/01\/15143949\/pearland-reflection-bay-water-reclamation.jpg","datePublished":"2020-01-17T12:16:14+00:00","dateModified":"2022-12-21T07:52:32+00:00","description":"The project, carried out by PLW and Webber, two subsidiaries of Ferrovial, wins ENR Best Project Award 2019.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/01\/15143949\/pearland-reflection-bay-water-reclamation.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/01\/15143949\/pearland-reflection-bay-water-reclamation.jpg","width":899,"height":550,"caption":"Pearland reflection bay watereclamation"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/pearland-water-reclamation-facility-project-recognized-as-one-of-the-enr-best-projects-of-2019\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Pearland Water Reclamation Facility Project recognized as one of the ENR\u2019 Best Projects of 2019"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/93985","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=93985"}],"version-history":[{"count":2,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/93985\/revisions"}],"predecessor-version":[{"id":94204,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/93985\/revisions\/94204"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/93982"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=93985"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=93985"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=93985"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=93985"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=93985"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=93985"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}