{"id":99635,"date":"2020-10-02T10:34:21","date_gmt":"2020-10-02T08:34:21","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=new&#038;p=99635"},"modified":"2022-12-21T08:46:29","modified_gmt":"2022-12-21T07:46:29","slug":"ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain","status":"publish","type":"new","link":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/","title":{"rendered":"Ferrovial Will Build Phase 2 of the Alcal\u00e1 Data Center for Nabiax, the Largest Campus in Spain"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>Through its subsidiary <a title=\"Ferrovial Construction\" href=\"https:\/\/www.ferrovial.com\/en\/business\/construction\/\" target=\"_blank\" rel=\"dofollow noopener\">Ferrovial Construction<\/a>, Ferrovial will build phase 2 of <a title=\"Nabiax\" href=\"https:\/\/nabiax.com\/en\/\" target=\"_blank\" rel=\"dofollow noopener\">Nabiax<\/a>&#8216;s <strong>Alcal\u00e1 Data Center (ADC)<\/strong> campus. This campus will be<strong> the largest in Spain<\/strong>, with over 100 MW of power. It will be powered by its own electrical substation, which will ensure a direct interconnection to the cloud.<\/p>\n<p>The expansion of the Alcal\u00e1 Data Center, called ADC2, will entail a total investment of <strong>\u20ac40 million<\/strong>. It will have up to 23 MW of power and house 15,100 m2 of technical infrastructure. The project will create <strong>more than 500 jobs<\/strong> in the city of Madrid and the Henares Corridor.<\/p>\n<p>The contract includes the construction of a two-story building to house technical rooms, service areas, storage areas, access control, and loading docks.<\/p>\n<p>On the other hand, the IT rooms will house high-tech data processing equipment, which will be backed by technical facilities located in two adjacent courtyards at the far ends of the block.<\/p>\n<h2>Sustainable Data Center<\/h2>\n<p>The current building on campus has 24,700 m2, 7 IT rooms, and up to 33 MW of power; it was also built by Ferrovial. This project was designed under the high standards of reliability set by the Uptime Institute for obtaining <strong>TIER IV Gold<\/strong> certification. This designation confirms that a center offers the highest possible security and redundancy, and this project is the first in Spain to obtain this certification. It also has Leed Gold certification, awarded by the Green Building Council. Its design and construction followed the strictest sustainability criteria, including significant <strong>reductions in water consumption, energy, and CO2 emissions<\/strong> compared to traditional Data Centers.<\/p>\n<p>Ferrovial&#8217;s experience in designing and building this sort of facility goes back to 2010 when they built over 11,000 m2 of Data Processing Centers. Reliability, efficiency, modularity, and flexibility are the four essential pillars for implementing these projects.<\/p>\n<p>Image courtesy of <a title=\"Nabiax\" href=\"https:\/\/nabiax.com\/en\/\" target=\"_blank\" rel=\"dofollow noopener\">Nabiax<\/a>.<\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":99629,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[1086,1933,2092],"nivel-5":[2148],"nivel-1":[896],"nivel-3":[1321],"nivel-4":[],"class_list":["post-99635","new","type-new","status-publish","has-post-thumbnail","hentry","nivel-2-big-data-en","nivel-2-design-and-construction","nivel-2-projects","nivel-5-ferrovial-construction","nivel-1-construction","nivel-3-spain"],"acf":[],"yoast_head":"<title>Ferrovial Will Build Phase 2 of the Alcal\u00e1 Data Center for Nabiax, the Largest Campus in Spain Ferrovial<\/title>\n<meta name=\"description\" content=\"The construction project will cost \u20ac30 million and create more than 500 new jobs in Madrid and the Henares Corridor.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ferrovial Will Build Phase 2 of the Alcal\u00e1 Data Center for Nabiax, the Largest Campus in Spain Ferrovial\" \/>\n<meta property=\"og:description\" content=\"The construction project will cost \u20ac30 million and create more than 500 new jobs in Madrid and the Henares Corridor.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-21T07:46:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2020\/10\/adc2-proyecto-1-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/\",\"name\":\"Ferrovial Will Build Phase 2 of the Alcal\u00e1 Data Center for Nabiax, the Largest Campus in Spain Ferrovial\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/10\/15143327\/adc2-proyecto-1-scaled.jpg\",\"datePublished\":\"2020-10-02T08:34:21+00:00\",\"dateModified\":\"2022-12-21T07:46:29+00:00\",\"description\":\"The construction project will cost \u20ac30 million and create more than 500 new jobs in Madrid and the Henares Corridor.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/10\/15143327\/adc2-proyecto-1-scaled.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/10\/15143327\/adc2-proyecto-1-scaled.jpg\",\"width\":2560,\"height\":1440,\"caption\":\"Ferrovial Will Build Phase 2 of the Alcal\u00e1 Data Center for Nabiax, the Largest Campus in Spain\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ferrovial Will Build Phase 2 of the Alcal\u00e1 Data Center for Nabiax, the Largest Campus in Spain\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"name\":\"Ferrovial\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Ferrovial Will Build Phase 2 of the Alcal\u00e1 Data Center for Nabiax, the Largest Campus in Spain Ferrovial","description":"The construction project will cost \u20ac30 million and create more than 500 new jobs in Madrid and the Henares Corridor.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/","og_locale":"en_US","og_type":"article","og_title":"Ferrovial Will Build Phase 2 of the Alcal\u00e1 Data Center for Nabiax, the Largest Campus in Spain Ferrovial","og_description":"The construction project will cost \u20ac30 million and create more than 500 new jobs in Madrid and the Henares Corridor.","og_url":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-21T07:46:29+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2020\/10\/adc2-proyecto-1-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/","url":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/","name":"Ferrovial Will Build Phase 2 of the Alcal\u00e1 Data Center for Nabiax, the Largest Campus in Spain Ferrovial","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/10\/15143327\/adc2-proyecto-1-scaled.jpg","datePublished":"2020-10-02T08:34:21+00:00","dateModified":"2022-12-21T07:46:29+00:00","description":"The construction project will cost \u20ac30 million and create more than 500 new jobs in Madrid and the Henares Corridor.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/10\/15143327\/adc2-proyecto-1-scaled.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2020\/10\/15143327\/adc2-proyecto-1-scaled.jpg","width":2560,"height":1440,"caption":"Ferrovial Will Build Phase 2 of the Alcal\u00e1 Data Center for Nabiax, the Largest Campus in Spain"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/en\/news\/ferrovial-will-build-phase-2-of-the-alcala-data-center-for-nabiax-the-largest-campus-in-spain\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Ferrovial Will Build Phase 2 of the Alcal\u00e1 Data Center for Nabiax, the Largest Campus in Spain"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/en\/#website","url":"https:\/\/newsroom.ferrovial.com\/en\/","name":"Ferrovial","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/99635","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/types\/new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/comments?post=99635"}],"version-history":[{"count":3,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/99635\/revisions"}],"predecessor-version":[{"id":99638,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/new\/99635\/revisions\/99638"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media\/99629"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/media?parent=99635"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-2?post=99635"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-5?post=99635"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-1?post=99635"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-3?post=99635"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/en\/wp-json\/wp\/v2\/nivel-4?post=99635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}