{"id":103798,"date":"2021-10-21T13:17:43","date_gmt":"2021-10-21T11:17:43","guid":{"rendered":"https:\/\/newsroom.ferrovial.com\/?post_type=local_new&#038;p=103798"},"modified":"2022-12-20T18:10:24","modified_gmt":"2022-12-20T17:10:24","slug":"adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa","status":"publish","type":"local_new","link":"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/","title":{"rendered":"Adjudicado a Cadagua el contrato de operaci\u00f3n y mantenimiento de la EDAR Terrassa"},"content":{"rendered":"    <section class=\"wysiwyg text-editor \" id=\"\">\n        <div class=\"container container--narrow container--p-10\">\n            <p>La \u201cAg\u00e8ncia Catalana de l\u2019Aigua (ACA)\u201d ha adjudicado a Cadagua el servicio de explotaci\u00f3n, conservaci\u00f3n y mantenimiento de la Estaci\u00f3n Depuradora de Aguas Residuales de Terrassa y su red de colectores en alta, con una duraci\u00f3n de 4 a\u00f1os, m\u00e1s un posible a\u00f1o de pr\u00f3rroga adicional. <strong>El importe de adjudicaci\u00f3n total supera los 11 millones \u20ac<\/strong> con la posible pr\u00f3rroga.<\/p>\n<p>La planta dispone de una capacitad de tratamiento de 75.000 m3\/d\u00eda, mediante reactores biol\u00f3gicos, combinando cultivo suspendido y fijo (IFAS), y otros 15.000 m3\/h mediante MBR, digesti\u00f3n anaerobia de fangos, codigesti\u00f3n y cogeneraci\u00f3n con una capacidad de producci\u00f3n el\u00e9ctrica nominal de 831 kWh. Anualmente <strong>esta planta produce 3.248 MW, lo que equivaldr\u00eda al consumo anual de 1000 hogares.<\/strong><\/p>\n<p>La propuesta t\u00e9cnica realizada por Cadagua ha consistido en la apuesta por la implantaci\u00f3n de tecnolog\u00edas de \u00faltima generaci\u00f3n, para la eliminaci\u00f3n de nitr\u00f3geno en los diferentes flujos existentes en la EDAR con alto contenido de este nutriente. Todo para aumentar el rendimiento de eliminaci\u00f3n global de nitr\u00f3geno de la instalaci\u00f3n y <strong>optimizando al m\u00e1ximo la eficiencia energ\u00e9tica. <\/strong><\/p>\n<p>Con esta adjudicaci\u00f3n, Cadagua se mantiene como uno de los referentes en tratamiento de agua residual <strong>en Catalu\u00f1a, d\u00f3nde gestiona 32 EDAR con un caudal anual depurado de 64.000.000 m3. <\/strong><\/p>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":103799,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","nivel-2":[909,936,2215,2210,1961,1962,1963],"nivel-5":[2158],"nivel-1":[2168],"nivel-3":[1258],"nivel-4":[],"class_list":["post-103798","local_new","type-local_new","status-publish","has-post-thumbnail","hentry","nivel-2-agua","nivel-2-conservacion-del-medio-ambiente","nivel-2-eficiencia-energetica","nivel-2-eficiencia-operativa","nivel-2-edar","nivel-2-edari","nivel-2-etap","nivel-5-cadagua","nivel-1-construccion","nivel-3-espana"],"acf":[],"yoast_head":"<title>Adjudicado a Cadagua el contrato de operaci\u00f3n y mantenimiento de la EDAR Terrassa - Sala de prensa Ferrovial | \u00daltimas noticias<\/title>\n<meta name=\"description\" content=\"La Ag\u00e8ncia Catalana de l\u2019Aigua ha adjudicado a Cadagua el servicio de explotaci\u00f3n, conservaci\u00f3n y mantenimiento.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Adjudicado a Cadagua el contrato de operaci\u00f3n y mantenimiento de la EDAR Terrassa - Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta property=\"og:description\" content=\"La Ag\u00e8ncia Catalana de l\u2019Aigua ha adjudicado a Cadagua el servicio de explotaci\u00f3n, conservaci\u00f3n y mantenimiento.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/\" \/>\n<meta property=\"og:site_name\" content=\"Sala de prensa Ferrovial | \u00daltimas noticias\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-20T17:10:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2021\/10\/edar-terrassa.png\" \/>\n\t<meta property=\"og:image:width\" content=\"788\" \/>\n\t<meta property=\"og:image:height\" content=\"525\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/\",\"url\":\"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/\",\"name\":\"Adjudicado a Cadagua el contrato de operaci\u00f3n y mantenimiento de la EDAR Terrassa - Sala de prensa Ferrovial | \u00daltimas noticias\",\"isPartOf\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/es\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/10\/15142535\/edar-terrassa.png\",\"datePublished\":\"2021-10-21T11:17:43+00:00\",\"dateModified\":\"2022-12-20T17:10:24+00:00\",\"description\":\"La Ag\u00e8ncia Catalana de l\u2019Aigua ha adjudicado a Cadagua el servicio de explotaci\u00f3n, conservaci\u00f3n y mantenimiento.\",\"breadcrumb\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/#primaryimage\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/10\/15142535\/edar-terrassa.png\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/10\/15142535\/edar-terrassa.png\",\"width\":788,\"height\":525,\"caption\":\"Edar terrassa\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/newsroom.ferrovial.com\/es\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Adjudicado a Cadagua el contrato de operaci\u00f3n y mantenimiento de la EDAR Terrassa\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/es\/#website\",\"url\":\"https:\/\/newsroom.ferrovial.com\/es\/\",\"name\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"description\":\"Sala de prensa Ferrovial | \u00daltimas noticias\",\"publisher\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/es\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/newsroom.ferrovial.com\/es\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/es\/#organization\",\"name\":\"Ferrovial S.A.\",\"url\":\"https:\/\/newsroom.ferrovial.com\/es\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/newsroom.ferrovial.com\/es\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"contentUrl\":\"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg\",\"width\":600,\"height\":300,\"caption\":\"Ferrovial S.A.\"},\"image\":{\"@id\":\"https:\/\/newsroom.ferrovial.com\/es\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ferrovial\",\"https:\/\/x.com\/ferrovial\",\"https:\/\/www.instagram.com\/ferrovial\/\",\"https:\/\/www.linkedin.com\/company\/ferrovial\",\"https:\/\/www.pinterest.es\/ferrovial\/\",\"https:\/\/www.youtube.com\/ferrovial\",\"https:\/\/en.wikipedia.org\/wiki\/Ferrovial\"]}]}<\/script>","yoast_head_json":{"title":"Adjudicado a Cadagua el contrato de operaci\u00f3n y mantenimiento de la EDAR Terrassa - Sala de prensa Ferrovial | \u00daltimas noticias","description":"La Ag\u00e8ncia Catalana de l\u2019Aigua ha adjudicado a Cadagua el servicio de explotaci\u00f3n, conservaci\u00f3n y mantenimiento.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/","og_locale":"es_ES","og_type":"article","og_title":"Adjudicado a Cadagua el contrato de operaci\u00f3n y mantenimiento de la EDAR Terrassa - Sala de prensa Ferrovial | \u00daltimas noticias","og_description":"La Ag\u00e8ncia Catalana de l\u2019Aigua ha adjudicado a Cadagua el servicio de explotaci\u00f3n, conservaci\u00f3n y mantenimiento.","og_url":"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/","og_site_name":"Sala de prensa Ferrovial | \u00daltimas noticias","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_modified_time":"2022-12-20T17:10:24+00:00","og_image":[{"width":788,"height":525,"url":"https:\/\/newsroom.ferrovial.com\/wp-content\/uploads\/sites\/4\/2021\/10\/edar-terrassa.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_site":"@ferrovial","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/","url":"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/","name":"Adjudicado a Cadagua el contrato de operaci\u00f3n y mantenimiento de la EDAR Terrassa - Sala de prensa Ferrovial | \u00daltimas noticias","isPartOf":{"@id":"https:\/\/newsroom.ferrovial.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/#primaryimage"},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/#primaryimage"},"thumbnailUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/10\/15142535\/edar-terrassa.png","datePublished":"2021-10-21T11:17:43+00:00","dateModified":"2022-12-20T17:10:24+00:00","description":"La Ag\u00e8ncia Catalana de l\u2019Aigua ha adjudicado a Cadagua el servicio de explotaci\u00f3n, conservaci\u00f3n y mantenimiento.","breadcrumb":{"@id":"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/#primaryimage","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/10\/15142535\/edar-terrassa.png","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2021\/10\/15142535\/edar-terrassa.png","width":788,"height":525,"caption":"Edar terrassa"},{"@type":"BreadcrumbList","@id":"https:\/\/newsroom.ferrovial.com\/es\/noticias-locales\/adjudicado-a-cadagua-el-contrato-de-operacion-y-mantenimiento-de-la-edar-terrassa\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/newsroom.ferrovial.com\/es\/"},{"@type":"ListItem","position":2,"name":"Adjudicado a Cadagua el contrato de operaci\u00f3n y mantenimiento de la EDAR Terrassa"}]},{"@type":"WebSite","@id":"https:\/\/newsroom.ferrovial.com\/es\/#website","url":"https:\/\/newsroom.ferrovial.com\/es\/","name":"Sala de prensa Ferrovial | \u00daltimas noticias","description":"Sala de prensa Ferrovial | \u00daltimas noticias","publisher":{"@id":"https:\/\/newsroom.ferrovial.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newsroom.ferrovial.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/newsroom.ferrovial.com\/es\/#organization","name":"Ferrovial S.A.","url":"https:\/\/newsroom.ferrovial.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/newsroom.ferrovial.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","contentUrl":"https:\/\/static.newsroom.ferrovial.com\/wp-content\/uploads\/2018\/07\/15145720\/Ferrovial_Logotipo1.jpg","width":600,"height":300,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/newsroom.ferrovial.com\/es\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial","https:\/\/www.instagram.com\/ferrovial\/","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.pinterest.es\/ferrovial\/","https:\/\/www.youtube.com\/ferrovial","https:\/\/en.wikipedia.org\/wiki\/Ferrovial"]}]}},"_links":{"self":[{"href":"https:\/\/newsroom.ferrovial.com\/es\/wp-json\/wp\/v2\/local_new\/103798","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsroom.ferrovial.com\/es\/wp-json\/wp\/v2\/local_new"}],"about":[{"href":"https:\/\/newsroom.ferrovial.com\/es\/wp-json\/wp\/v2\/types\/local_new"}],"replies":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/es\/wp-json\/wp\/v2\/comments?post=103798"}],"version-history":[{"count":1,"href":"https:\/\/newsroom.ferrovial.com\/es\/wp-json\/wp\/v2\/local_new\/103798\/revisions"}],"predecessor-version":[{"id":103801,"href":"https:\/\/newsroom.ferrovial.com\/es\/wp-json\/wp\/v2\/local_new\/103798\/revisions\/103801"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/es\/wp-json\/wp\/v2\/media\/103799"}],"wp:attachment":[{"href":"https:\/\/newsroom.ferrovial.com\/es\/wp-json\/wp\/v2\/media?parent=103798"}],"wp:term":[{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/es\/wp-json\/wp\/v2\/nivel-2?post=103798"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/es\/wp-json\/wp\/v2\/nivel-5?post=103798"},{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/es\/wp-json\/wp\/v2\/nivel-1?post=103798"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/es\/wp-json\/wp\/v2\/nivel-3?post=103798"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/newsroom.ferrovial.com\/es\/wp-json\/wp\/v2\/nivel-4?post=103798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}