This is an excerpt taken from an ENR article. Click here to read the article in its entirety on the ENR site.
Three Texas highway projects were included in the infrastructure work.
In addition to Grand Parkway, the $191-million US 281 Expansion Project in San Antonio includes construction of non-tolled general purpose lanes, HOV/transit lanes and frontage roads, a connection to the new VIA Metropolitan Transit US 281 and four interchange direct connectors at Loop 1604. Construction is scheduled for completion in October 2020 by the contractor, Webber LLC, The Woodlands, Texas, and construction engineer/inspector VRX Inc., Plano, Texas.
The $191-million design-bid-build IH 45 Reconstruction Project at New Waverly in Walker County will expand the existing interstate to six travel lanes and replace existing bridges, drainage structures and frontage roads. Webber LLC and the Dallas office of AECOM expect to complete work by March 2021.


