Local News

Cadagua Completes the Construction and Start-up of the Agro Sevilla Waste Water Treatment Plant

  • The contract awarded has included the engineering, supply of equipments and tanks, mechanical, electrical and control assembly, and start-up of the plant
  • The WWTP has a capacity of 900 m3 / day of wastewater

Cadagua has successfully completed the works contracted by the cooperative Agro Sevilla Aceitunas, S.C.A.  related to the construction of a Waste Water Treatment Plant (WWTP) for the table olive packaging factory of this cooperative.

The contract awarded has included the engineering, supply of equipments and tanks, mechanical, electrical and control assembly, and start-up of the plant.

The WWTP has a capacity of 900 m3 / day of wastewater. The water line consists of an anaerobic treatment, followed by an aerobic treatment of activated sludge, secondary clarification and tertiary treatment. The facility is completed with a biogas line consisting of a gasometer and torch, and a sludge dewatering line with a decanter. In addition, the installation of a new control panel.

With this project Cadagua reinforces its position as a leading company in the installation of industrial wastewater treatment plants within the food industry sector, being its first reference in the olive packaging industry.

Contact Us

Head of External communication and Institutional relations

Ana García Ruiz

External communication and media relations

Isabel Muñoz Torres

Head of US Corporate Communications and Brand

Rebecca Rountree

+1 (512) 568-5015

UK Communications Director

Laura Brown

+44 75 9577 8605