Tecpresa executed the works of installation and stressing of a two new structures with lock coil rope stay cables.
The Viaduct over the Barranco de Erques in the new Adeje-Santiago del Teide road in Tenerife, (Canary Islands – Spain).
This is an arched bridge with a span of 110 m with an intermediary deck suspended on two side arch by 48 lock coil rope stay cables with a maximum length of 15 m and 60 mm diameter.
The Frank Gerhy Bridge in Bilbao, is the first inverted Fink truss road bridge built in the world. The bridge has a main span of 77 m and an average width of 28 m that includes 4 different road lanes, pedestrian lanes on both sides and a bicycle lane.
The deck is suspended on steel masts by 64 lock coil rope stays with a maximum length of 16 m and 90 mm diameter.