Local News

TECPRESA Installs the Lock Coil Rope stay cables of two new structures

Tecpresa executed the works of installation and stressing of a two new structures with lock coil rope stay cables.

The Viaduct over the Barranco de Erques in the new Adeje-Santiago del Teide road in Tenerife, (Canary Islands – Spain).

This is an arched bridge with a span of 110 m with an intermediary deck suspended on two side arch by 48 lock coil rope stay cables with a maximum length of 15 m and 60 mm diameter.

 

The Frank Gerhy Bridge in Bilbao, is the first inverted Fink truss road bridge built in the world. The bridge has a main span of 77 m and an average width of 28 m that includes 4 different road lanes, pedestrian lanes on both sides and a bicycle lane.

The deck is suspended on steel masts by 64 lock coil rope stays with a maximum length of 16 m and 90 mm diameter.

Contact Us

Head of External communication and Institutional relations

Ana García Ruiz

External communication and media relations

Isabel Muñoz Torres

Head of US Corporate Communications and Brand

Rebecca Rountree

+1 (512) 568-5015

UK Communications Director

Laura Brown

+44 75 9577 8605